REZINA.UZ
ELASTIK FORM
From idea to finished part.
Sample-based Products
from 100 pcsStandard: 3–5 daysDelivery to Andijan in 1-2 daysQuality guarantee

Custom Rubber Parts by Sample in Andijan

We manufacture rubber parts by sample by drawing, sample or customer dimensions at our Tashkent production site. Main materials: NBR, EPDM, Viton. Delivery to Andijan in 1-2 days. We work with Fergana Valley industrial enterprises. Andijan is strong in automotive and electrical — for Rubber Parts by Sample we match rubber grades to actual operating conditions at regional sites.

Materials
NBREPDMVitonSiliconePolyurethane
Applications
  • Worn parts replacement
  • Import substitution
  • Rare and discontinued products
  • Non-standard seals
  • Prototyping
Advantages
  • ✓No drawing needed
  • ✓Precise measurement at factory
  • ✓Material selection for environment
  • ✓Turnkey mold making
  • ✓Serial production from 100 pcs

Foreign stamping, welding and assembly machine parts at UzAuto and Andijan plant are often unavailable to order — we make copies from sample in NBR and EPDM within 48–72 hours.

Andijan region is Uzbekistan's machine-building center. UzAuto Motors, Andijankabel electrical plant and oil processing create steady demand for automotive seals, cable bushings and food-grade gaskets. We've worked with valley enterprises for over 3 years and understand each industry's requirements.

Delivery & production

Andijan · Delivery to Andijan in 1-2 days

Manufactured in Tashkent. Delivery to Andijan in 1-2 days. Packaging and shipping method are agreed before dispatch.

Made at our own plant in Tashkent. Packaging and batch documents included.

Material selection by conditions

Short guide — full table on the product page

MediumTemperaturePressureMaterial
Import part replacementper sampleper sampleSelected by analysis
Pumps, fittingsup to +150 °Cup to 40 barNBR, EPDM, Viton
Agricultural machinery−20…+90 °Cup to 10 barNBR, NR

Full material selection table →

FAQ

Delivery, materials and lead times for your order

Pick a topic or open any question

We manufacture in Tashkent and ship to Andijan by transport company. Delivery to Andijan in 1-2 days. Double packaging and cargo tracking.

Depends on medium (oil, water, steam, chemicals), temperature and pressure. Send drawing or sample via WhatsApp — our engineer will select NBR, EPDM, Viton, silicone or polyurethane for your site in Andijan. Short guide table below; full grades on the product page.

Minimum quantity depends on the product and material. Standard lead time is 3–5 business days; a new mold usually requires 10–14 days. We confirm the exact schedule after reviewing the drawing or sample.

Yes. Send drawing, photos or the worn part via WhatsApp — we quote lead time, material and price. For plants in Andijan, photos with a scale and operating medium description are usually enough.

If the part does not match the approved drawing in dimensions and material, we rework at our cost. Before a production run we agree tolerances and inspection method.

Manufacturing and warehouse are in Tashkent. Delivery to Andijan in 1-2 days. After production we hand over to a carrier or arrange courier delivery.