REZINA.UZ
ELASTIK FORM
From idea to finished part.
Sample-based Products
from 100 pcsStandard: 3–5 daysDelivery to Chilanzar in 1 dayQuality guarantee

Custom Rubber Parts by Sample in Chilanzar District, Tashkent

We manufacture rubber parts by sample by drawing, sample or customer dimensions at our Tashkent production site. Main materials: NBR, EPDM, Viton. Delivery to Chilanzar in 1 day. We work with machine shops and vehicle repair facilities. Chilanzar District is active in auto repair and machine shops; for Rubber Parts by Sample we match materials to Chilanzar auto repair and machine shops operating conditions.

Materials
NBREPDMVitonSiliconePolyurethane
Applications
  • Worn parts replacement
  • Import substitution
  • Rare and discontinued products
  • Non-standard seals
  • Prototyping
Advantages
  • ✓No drawing needed
  • ✓Precise measurement at factory
  • ✓Material selection for environment
  • ✓Turnkey mold making
  • ✓Serial production from 100 pcs

Chilanzar auto repair enterprises constantly need copies of rare foreign car parts. From worn sample: gaskets, cuffs, caps, dust covers — from 48 hours.

Chilanzar is one of Tashkent's most populous districts. Machine shops, auto repair facilities, food production plants are located here. Regular rubber product customers include repair bases, industrial pump stations and water supply facilities.

Delivery & production

Chilanzar District · Delivery to Chilanzar in 1 day

Manufactured in Tashkent. Delivery to Chilanzar in 1 day. Packaging and handover time are agreed before dispatch.

Made at our own plant in Tashkent. Packaging and batch documents included.

Material selection by conditions

Short guide — full table on the product page

MediumTemperaturePressureMaterial
Import part replacementper sampleper sampleSelected by analysis
Pumps, fittingsup to +150 °Cup to 40 barNBR, EPDM, Viton
Agricultural machinery−20…+90 °Cup to 10 barNBR, NR

Full material selection table →

FAQ

Delivery, materials and lead times for your order

Pick a topic or open any question

After production, we send the order to Chilanzar District by courier or carrier. Delivery to Chilanzar in 1 day. Handover time is confirmed with the order; packaging and documents are included.

Depends on medium (oil, water, steam, chemicals), temperature and pressure. Send drawing or sample via WhatsApp — our engineer will select NBR, EPDM, Viton, silicone or polyurethane for your site in Chilanzar District. Short guide table below; full grades on the product page.

Minimum quantity depends on the product and material. Standard lead time is 3–5 business days; a new mold usually requires 10–14 days. We confirm the exact schedule after reviewing the drawing or sample.

Yes. Send drawing, photos or the worn part via WhatsApp — we quote lead time, material and price. For plants in Chilanzar District, photos with a scale and operating medium description are usually enough.

If the part does not match the approved drawing in dimensions and material, we rework at our cost. Before a production run we agree tolerances and inspection method.

Manufacturing and warehouse are in Tashkent. Delivery to Chilanzar in 1 day. After production we hand over to a carrier or arrange courier delivery.