REZINA.UZ
ELASTIK FORM LLC
From idea to finished part.
Sample-based Products
from 100 pcsFrom 48 hoursDelivery to Sergeli in 1 dayQuality guarantee

Sample-based Products in Sergeli District — NBR, EPDM, Viton

Order sample-based products delivered to Sergeli District. Materials: NBR, EPDM, Viton. Delivery to Sergeli in 1 day. We cooperate with construction companies and utilities. Sergeli District is active in construction and utilities; for Sample-based Products we match materials to Sergeli construction and utility services operating conditions.

Materials
NBREPDMVitonSiliconePolyurethane
Applications
  • Worn parts replacement
  • Import substitution
  • Rare and discontinued products
  • Non-standard seals
  • Prototyping
Advantages
  • No drawing needed
  • Precise measurement at factory
  • Material selection for environment
  • Turnkey mold making
  • Serial production from 100 pcs

We deliver to Sergeli District same day or next day. Proper packaging, documentation for every batch.

Sergeli construction and utility machinery needs replacement of foreign-made rubber parts. Sample or photo with dimensions — 48–72 hours.

Sergeli District is booming: new residential complexes are built, utilities are laid, manufacturing opens. Water supply pump stations, construction companies and utilities create steady demand for EPDM seals for water systems, cuffs for construction equipment and plumbing gaskets.

Material selection by conditions

Guide by medium, temperature and pressure — exact quote after drawing

MediumTemperaturePressureMaterial
Import part replacementper sampleper sampleSelected by analysis
Pumps, fittingsup to +150 °Cup to 40 barNBR, EPDM, Viton
Agricultural machinery−20…+90 °Cup to 10 barNBR, NR
Unique geometrycustomcustomAny rubber grade

FAQ

Delivery, materials and lead times for your order

Pick a topic or open any question

Our factory is in Tashkent — we deliver to Sergeli District same day or next morning by courier or carrier. Delivery to Sergeli in 1 day. Packaging and documents for every batch.

Depends on medium (oil, water, steam, chemicals), temperature and pressure. Send drawing or sample via Telegram — our engineer will select NBR, EPDM, Viton, silicone or polyurethane for your site in Sergeli District. See the selection table below.

From 100 pcs (or one batch for custom shapes). Lead time from 48 hours after drawing and material approval. For urgent orders to Sergeli District, ask when ordering — we often accelerate using existing molds.

HomeCatalog
BlogOrderContacts