REZINA.UZ
ELASTIK FORM
From idea to finished part.
Sample-based Products
from 100 pcsStandard: 3–5 daysDelivery to Yakkasaray in 1 dayQuality guarantee

Custom Rubber Parts by Sample in Yakkasaray District, Tashkent

We manufacture rubber parts by sample by drawing, sample or customer dimensions at our Tashkent production site. Main materials: NBR, EPDM, Viton. Delivery to Yakkasaray in 1 day. We work with food plants and warehouse complexes. Yakkasaray District is active in food and warehousing; for Rubber Parts by Sample we match materials to Yakkasaray food plants and warehouses operating conditions.

Materials
NBREPDMVitonSiliconePolyurethane
Applications
  • Worn parts replacement
  • Import substitution
  • Rare and discontinued products
  • Non-standard seals
  • Prototyping
Advantages
  • ✓No drawing needed
  • ✓Precise measurement at factory
  • ✓Material selection for environment
  • ✓Turnkey mold making
  • ✓Serial production from 100 pcs

Yakkasaray food plants urgently need replacement of worn imported processing and packaging equipment parts. Silicone selected for product contact in 3–5 business days.

Yakkasaray District is Tashkent's business center with banks, shopping centers and service enterprises. Auto services and repair shops order oil-resistant NBR seals for engines and hydraulic systems, plus gaskets for building plumbing systems.

Delivery & production

Yakkasaray District · Delivery to Yakkasaray in 1 day

Manufactured in Tashkent. Delivery to Yakkasaray in 1 day. Packaging and handover time are agreed before dispatch.

Made at our own plant in Tashkent. Packaging and batch documents included.

Material selection by conditions

Short guide — full table on the product page

MediumTemperaturePressureMaterial
Import part replacementper sampleper sampleSelected by analysis
Pumps, fittingsup to +150 °Cup to 40 barNBR, EPDM, Viton
Agricultural machinery−20…+90 °Cup to 10 barNBR, NR

Full material selection table →

FAQ

Delivery, materials and lead times for your order

Pick a topic or open any question

After production, we send the order to Yakkasaray District by courier or carrier. Delivery to Yakkasaray in 1 day. Handover time is confirmed with the order; packaging and documents are included.

Depends on medium (oil, water, steam, chemicals), temperature and pressure. Send drawing or sample via WhatsApp — our engineer will select NBR, EPDM, Viton, silicone or polyurethane for your site in Yakkasaray District. Short guide table below; full grades on the product page.

Minimum quantity depends on the product and material. Standard lead time is 3–5 business days; a new mold usually requires 10–14 days. We confirm the exact schedule after reviewing the drawing or sample.

Yes. Send drawing, photos or the worn part via WhatsApp — we quote lead time, material and price. For plants in Yakkasaray District, photos with a scale and operating medium description are usually enough.

If the part does not match the approved drawing in dimensions and material, we rework at our cost. Before a production run we agree tolerances and inspection method.

Manufacturing and warehouse are in Tashkent. Delivery to Yakkasaray in 1 day. After production we hand over to a carrier or arrange courier delivery.