REZINA.UZ
ELASTIK FORM
From idea to finished part.
Sample-based Products
from 100 pcsStandard: 3–5 daysDelivery to Yangihayot in 1 dayQuality guarantee

Custom Rubber Parts by Sample in Yangihayot District, Tashkent

We take orders for rubber parts by sample for plants in Yangihayot District. Made to drawing, sample or dimensions at our Tashkent plant. Main materials: NBR, EPDM, Viton. Delivery to Yangihayot in 1 day.

Materials
NBREPDMVitonSiliconePolyurethane
Applications
  • Worn parts replacement
  • Import substitution
  • Rare and discontinued products
  • Non-standard seals
  • Prototyping
Advantages
  • ✓No drawing needed
  • ✓Precise measurement at factory
  • ✓Material selection for environment
  • ✓Turnkey mold making
  • ✓Serial production from 100 pcs

For construction in Yangihayot, NBR is recommended for hydraulic-cylinder cuffs, and a polyurethane wiper if sand reaches the lip. EPDM for water and heating in the new houses.

Delivery & production

Yangihayot District · Delivery to Yangihayot in 1 day

Manufactured in Tashkent. Delivery to Yangihayot in 1 day. Packaging and handover time are agreed before dispatch.

Made at our own plant in Tashkent. Packaging and batch documents included.

Material selection by conditions

Short guide — full table on the product page

MediumTemperaturePressureMaterial
Import part replacementper sampleper sampleSelected by analysis
Pumps, fittingsup to +150 °Cup to 40 barNBR, EPDM, Viton
Agricultural machinery−20…+90 °Cup to 10 barNBR, NR

Full material selection table →

FAQ

Delivery, materials and lead times for your order

Pick a topic or open any question

After production, we send the order to Yangihayot District by courier or carrier. Delivery to Yangihayot in 1 day. Handover time is confirmed with the order; packaging and documents are included.

Depends on medium (oil, water, steam, chemicals), temperature and pressure. Send drawing or sample via WhatsApp — our engineer will select NBR, EPDM, Viton, silicone or polyurethane for your site in Yangihayot District. Short guide table below; full grades on the product page.

Minimum quantity depends on the product and material. Standard lead time is 3–5 business days; a new mold usually requires 10–14 days. We confirm the exact schedule after reviewing the drawing or sample.

Yes. Send drawing, photos or the worn part via WhatsApp — we quote lead time, material and price. For plants in Yangihayot District, photos with a scale and operating medium description are usually enough.

If the part does not match the approved drawing in dimensions and material, we rework at our cost. Before a production run we agree tolerances and inspection method.

Manufacturing and warehouse are in Tashkent. Delivery to Yangihayot in 1 day. After production we hand over to a carrier or arrange courier delivery.