REZINA.UZ
ELASTIK FORM
From idea to finished part.
Sample-based Products
from 100 pcsStandard: 3–5 daysDelivery to Urgench in 2-3 daysQuality guarantee

Custom Rubber Parts by Sample in Urgench

We manufacture rubber parts by sample by drawing, sample or customer dimensions at our Tashkent production site. Main materials: NBR, EPDM, Viton. Delivery to Urgench in 2-3 days. We work with Khorezm region enterprises. Urgench is strong in agribusiness and cotton processing — for Rubber Parts by Sample we match rubber grades to actual operating conditions at regional sites.

Materials
NBREPDMVitonSiliconePolyurethane
Applications
  • Worn parts replacement
  • Import substitution
  • Rare and discontinued products
  • Non-standard seals
  • Prototyping
Advantages
  • No drawing needed
  • Precise measurement at factory
  • Material selection for environment
  • Turnkey mold making
  • Serial production from 100 pcs

Khorezm cotton gin and oil press machines have obsolete parts with long waits. We copy rubber parts from sample in NBR, NR and EPDM in the shortest time.

Khorezm region is an agricultural area with extensive irrigation infrastructure. Dozens of pump stations maintain cotton field irrigation — all need regular replacement of oil seals, cuffs and sealing rings. Cotton gins and flour mills order food-grade silicone gaskets and EPDM seals.

Delivery & production

Urgench · Delivery to Urgench in 2-3 days

Manufactured in Tashkent. Delivery to Urgench in 2-3 days. Packaging and shipping method are agreed before dispatch.

Made at our own plant in Tashkent. Packaging and batch documents included.

Material selection by conditions

Short guide — full table on the product page

MediumTemperaturePressureMaterial
Import part replacementper sampleper sampleSelected by analysis
Pumps, fittingsup to +150 °Cup to 40 barNBR, EPDM, Viton
Agricultural machinery−20…+90 °Cup to 10 barNBR, NR

Full material selection table →

FAQ

Delivery, materials and lead times for your order

Pick a topic or open any question

We manufacture in Tashkent and ship to Urgench by transport company. Delivery to Urgench in 2-3 days. Double packaging and cargo tracking.

Depends on medium (oil, water, steam, chemicals), temperature and pressure. Send drawing or sample via WhatsApp — our engineer will select NBR, EPDM, Viton, silicone or polyurethane for your site in Urgench. Short guide table below; full grades on the product page.

Minimum quantity depends on the product and material. Standard lead time is 3–5 business days; a new mold usually requires 10–14 days. We confirm the exact schedule after reviewing the drawing or sample.

Yes. Send drawing, photos or the worn part via WhatsApp — we quote lead time, material and price. For plants in Urgench, photos with a scale and operating medium description are usually enough.

If the part does not match the approved drawing in dimensions and material, we rework at our cost. Before a production run we agree tolerances and inspection method.

Manufacturing and warehouse are in Tashkent. Delivery to Urgench in 2-3 days. After production we hand over to a carrier or arrange courier delivery.