REZINA.UZ
ELASTIK FORM LLC
From idea to finished part.
Cuffs
from 100 pcsFrom 48 hoursDelivery to Fergana in 1-2 daysQuality guarantee

Cuffs factory for Fergana — Full cycle & delivery

Urgent cuffs order to Fergana: production from 48 hours after drawing approval. Materials: NBR, EPDM, Viton / FKM, made in Tashkent. Delivery to Fergana in 1-2 days. We work with Fergana region production facilities. Fergana is strong in petrochemicals and chemicals — for Cuffs we match rubber grades to actual operating conditions at regional sites.

Materials
NBREPDMViton / FKMPolyurethaneSilicone
Applications
  • Hydraulic cylinders
  • Pumps and compressors
  • Pneumatic systems
  • Rods and pistons
  • Industrial machines
Advantages
  • Precise dimensions by drawing
  • High wear resistance
  • High pressure operation
  • From 100 pcs
  • Import substitute

Own factory in Tashkent. Delivery to Fergana in 1-2 days. Reliable packaging, cargo tracking.

Fergana petrochemical reactor and pump units operate in hydrocarbon and acid media — FKM/Viton cuffs with PTFE lip at up to 250 bar.

Fergana region is Uzbekistan's chemical industry center. The Fergana refinery and Fergana-Azot have strict requirements for seal chemical resistance. We select materials (Viton, FKM, PTFE) for aggressive media at temperatures up to +250°C, ensuring long part service life.

Material selection by conditions

Guide by medium, temperature and pressure — exact quote after drawing

MediumTemperaturePressureMaterial
Hydraulic oil−30…+100 °Cup to 250 barNBR, polyurethane
Pneumatics, compressed air−20…+80 °Cup to 16 barNBR, EPDM
Emulsions, coolantup to +90 °Cup to 160 barNBR + PTFE lip
Water with additivesup to +120 °Cup to 40 barEPDM

FAQ

Delivery, materials and lead times for your order

Pick a topic or open any question

We manufacture in Tashkent and ship to Fergana by transport company. Delivery to Fergana in 1-2 days. Double packaging and cargo tracking.

Depends on medium (oil, water, steam, chemicals), temperature and pressure. Send drawing or sample via Telegram — our engineer will select NBR, EPDM, Viton, silicone or polyurethane for your site in Fergana. See the selection table below.

From 100 pcs (or one batch for custom shapes). Lead time from 48 hours after drawing and material approval. For urgent orders to Fergana, ask when ordering — we often accelerate using existing molds.

HomeCatalog
BlogOrderContacts