REZINA.UZ
ELASTIK FORM LLC
From idea to finished part.
Cuffs
from 100 pcsFrom 48 hoursDelivery to Gulistan in 1 dayQuality guarantee

Cuffs in Gulistan — Production & Delivery

Import replacement cuffs for Gulistan enterprises. By sample or drawing from NBR, EPDM, Viton / FKM. Delivery to Gulistan in 1 day. Supplying Syrdarya region enterprises. Gulistan is strong in irrigation and processing — for Cuffs we match rubber grades to actual operating conditions at regional sites.

Materials
NBREPDMViton / FKMPolyurethaneSilicone
Applications
  • Hydraulic cylinders
  • Pumps and compressors
  • Pneumatic systems
  • Rods and pistons
  • Industrial machines
Advantages
  • Precise dimensions by drawing
  • High wear resistance
  • High pressure operation
  • From 100 pcs
  • Import substitute

Own factory in Tashkent. Delivery to Gulistan in 1 day. Reliable packaging, cargo tracking.

Syrdarya irrigation pump units and processing lines use EPDM cuffs for water cylinders and NBR for hydraulic presses at food plants.

Syrdarya region is an energy and agricultural hub. Syrdarya GRES (the country's largest thermal power plant) uses heat-resistant seals for turbines and steam lines. Irrigation canal pump stations order cuffs and oil seals for centrifugal pumps. We deliver in 1 day as Gulistan is only 120 km from our factory.

Material selection by conditions

Guide by medium, temperature and pressure — exact quote after drawing

MediumTemperaturePressureMaterial
Hydraulic oil−30…+100 °Cup to 250 barNBR, polyurethane
Pneumatics, compressed air−20…+80 °Cup to 16 barNBR, EPDM
Emulsions, coolantup to +90 °Cup to 160 barNBR + PTFE lip
Water with additivesup to +120 °Cup to 40 barEPDM

FAQ

Delivery, materials and lead times for your order

Pick a topic or open any question

We manufacture in Tashkent and ship to Gulistan by transport company. Delivery to Gulistan in 1 day. Double packaging and cargo tracking.

Depends on medium (oil, water, steam, chemicals), temperature and pressure. Send drawing or sample via Telegram — our engineer will select NBR, EPDM, Viton, silicone or polyurethane for your site in Gulistan. See the selection table below.

From 100 pcs (or one batch for custom shapes). Lead time from 48 hours after drawing and material approval. For urgent orders to Gulistan, ask when ordering — we often accelerate using existing molds.

HomeCatalog
BlogOrderContacts