REZINA.UZ
ELASTIK FORM LLC
From idea to finished part.
Cuffs
from 100 pcsFrom 48 hoursDelivery to Namangan in 1-2 daysQuality guarantee

Cuffs in Namangan — NBR, EPDM, Viton / FKM, made in Tashkent

Direct-from-manufacturer cuffs supply to Namangan. Any volume from 100 pcs, materials: NBR, EPDM, Viton / FKM. Full cycle: measurement → mold → series. Delivery to Namangan in 1-2 days. Namangan is strong in textile, leather and food — for Cuffs we match rubber grades to actual operating conditions at regional sites.

Materials
NBREPDMViton / FKMPolyurethaneSilicone
Applications
  • Hydraulic cylinders
  • Pumps and compressors
  • Pneumatic systems
  • Rods and pistons
  • Industrial machines
Advantages
  • Precise dimensions by drawing
  • High wear resistance
  • High pressure operation
  • From 100 pcs
  • Import substitute

Manufactured in Tashkent. Delivery to Namangan in 1-2 days. Packed in corrugated cardboard and stretch film.

Namangan loom hydraulic systems and press equipment need NBR cuffs. Steam cylinders of finishing equipment — EPDM up to +150°C.

Namangan region specializes in light industry and agricultural processing. Silk mills need vibration-isolating bushings for looms, canning factories require food-grade silicone seals, and leather plants order chemical-resistant gaskets from EPDM and Viton. We select the optimal material for each application.

Material selection by conditions

Guide by medium, temperature and pressure — exact quote after drawing

MediumTemperaturePressureMaterial
Hydraulic oil−30…+100 °Cup to 250 barNBR, polyurethane
Pneumatics, compressed air−20…+80 °Cup to 16 barNBR, EPDM
Emulsions, coolantup to +90 °Cup to 160 barNBR + PTFE lip
Water with additivesup to +120 °Cup to 40 barEPDM

FAQ

Delivery, materials and lead times for your order

Pick a topic or open any question

We manufacture in Tashkent and ship to Namangan by transport company. Delivery to Namangan in 1-2 days. Double packaging and cargo tracking.

Depends on medium (oil, water, steam, chemicals), temperature and pressure. Send drawing or sample via Telegram — our engineer will select NBR, EPDM, Viton, silicone or polyurethane for your site in Namangan. See the selection table below.

From 100 pcs (or one batch for custom shapes). Lead time from 48 hours after drawing and material approval. For urgent orders to Namangan, ask when ordering — we often accelerate using existing molds.

HomeCatalog
BlogOrderContacts