REZINA.UZ
ELASTIK FORM LLC
From idea to finished part.
Cuffs
from 100 pcsFrom 48 hoursDelivery to Nukus in 2-3 daysQuality guarantee

Cuffs factory for Nukus — Full cycle & delivery

Rework guarantee for cuffs if drawing mismatch. Supply to Nukus from NBR, EPDM, Viton / FKM. Delivery to Nukus in 2-3 days. Experience with Karakalpakstan enterprises. Nukus is strong in irrigation and gas production — for Cuffs we match rubber grades to actual operating conditions at regional sites.

Materials
NBREPDMViton / FKMPolyurethaneSilicone
Applications
  • Hydraulic cylinders
  • Pumps and compressors
  • Pneumatic systems
  • Rods and pistons
  • Industrial machines
Advantages
  • Precise dimensions by drawing
  • High wear resistance
  • High pressure operation
  • From 100 pcs
  • Import substitute

Own factory in Tashkent. Delivery to Nukus in 2-3 days. Reliable packaging, cargo tracking.

Karakalpakstan irrigation canal pump stations use EPDM cuffs for water cylinders. For gas field drilling rigs — NBR Shore A 80.

Karakalpakstan has an extensive irrigation system and gas extraction facilities. Aral region pump stations, water treatment plants and gas compressors need EPDM (water-resistant) and NBR (oil-resistant) seals. Distance from Tashkent is offset by our streamlined logistics and double packaging.

Material selection by conditions

Guide by medium, temperature and pressure — exact quote after drawing

MediumTemperaturePressureMaterial
Hydraulic oil−30…+100 °Cup to 250 barNBR, polyurethane
Pneumatics, compressed air−20…+80 °Cup to 16 barNBR, EPDM
Emulsions, coolantup to +90 °Cup to 160 barNBR + PTFE lip
Water with additivesup to +120 °Cup to 40 barEPDM

FAQ

Delivery, materials and lead times for your order

Pick a topic or open any question

We manufacture in Tashkent and ship to Nukus by transport company. Delivery to Nukus in 2-3 days. Double packaging and cargo tracking.

Depends on medium (oil, water, steam, chemicals), temperature and pressure. Send drawing or sample via Telegram — our engineer will select NBR, EPDM, Viton, silicone or polyurethane for your site in Nukus. See the selection table below.

From 100 pcs (or one batch for custom shapes). Lead time from 48 hours after drawing and material approval. For urgent orders to Nukus, ask when ordering — we often accelerate using existing molds.

HomeCatalog
BlogOrderContacts