REZINA.UZ
ELASTIK FORM LLC
From idea to finished part.
Cuffs
from 100 pcsFrom 48 hoursDelivery to Shaykhantohur in 1 dayQuality guarantee

Cuffs in Shaykhantohur District — NBR, EPDM, Viton / FKM

Import replacement cuffs for industrial enterprises and maintenance services in Shaykhantohur District. From NBR, EPDM, Viton / FKM. Delivery to Shaykhantohur in 1 day. Shaykhantohur District is active in industry and services; for Cuffs we match materials to Shaykhantohur industrial and service enterprises operating conditions.

Materials
NBREPDMViton / FKMPolyurethaneSilicone
Applications
  • Hydraulic cylinders
  • Pumps and compressors
  • Pneumatic systems
  • Rods and pistons
  • Industrial machines
Advantages
  • Precise dimensions by drawing
  • High wear resistance
  • High pressure operation
  • From 100 pcs
  • Import substitute

Made in Tashkent, delivery across Shaykhantohur District in 1 day. Corrugated cardboard and stretch wrap.

Shaykhantohur industrial hydraulic and pneumatic systems need NBR cuffs. Boiler steam plants — EPDM up to +150°C.

Shaykhantohur is Tashkent's oldest administrative district. The dense water supply, sewage and heating networks require constant replacement of valve seals, pump cuffs and flange gaskets. District utility companies are our regular partners.

Material selection by conditions

Guide by medium, temperature and pressure — exact quote after drawing

MediumTemperaturePressureMaterial
Hydraulic oil−30…+100 °Cup to 250 barNBR, polyurethane
Pneumatics, compressed air−20…+80 °Cup to 16 barNBR, EPDM
Emulsions, coolantup to +90 °Cup to 160 barNBR + PTFE lip
Water with additivesup to +120 °Cup to 40 barEPDM

FAQ

Delivery, materials and lead times for your order

Pick a topic or open any question

Our factory is in Tashkent — we deliver to Shaykhantohur District same day or next morning by courier or carrier. Delivery to Shaykhantohur in 1 day. Packaging and documents for every batch.

Depends on medium (oil, water, steam, chemicals), temperature and pressure. Send drawing or sample via Telegram — our engineer will select NBR, EPDM, Viton, silicone or polyurethane for your site in Shaykhantohur District. See the selection table below.

From 100 pcs (or one batch for custom shapes). Lead time from 48 hours after drawing and material approval. For urgent orders to Shaykhantohur District, ask when ordering — we often accelerate using existing molds.

HomeCatalog
BlogOrderContacts