REZINA.UZ
ELASTIK FORM
From idea to finished part.
Cuffs
from 100 pcsStandard: 3–5 daysDelivery to Yakkasaray in 1 dayQuality guarantee

Custom Rubber Cuffs in Yakkasaray District, Tashkent

We manufacture rubber cuffs by drawing, sample or customer dimensions at our Tashkent production site. Main materials: NBR, EPDM, Viton / FKM. Delivery to Yakkasaray in 1 day. We work with food plants and warehouse complexes. Yakkasaray District is active in food and warehousing; for Rubber Cuffs we match materials to Yakkasaray food plants and warehouses operating conditions.

Materials
NBREPDMViton / FKMPolyurethaneSilicone
Applications
  • Hydraulic cylinders
  • Pumps and compressors
  • Pneumatic systems
  • Rods and pistons
  • Industrial machines
Advantages
  • ✓Precise dimensions by drawing
  • ✓High wear resistance
  • ✓High pressure operation
  • ✓From 100 pcs
  • ✓Import substitute

Yakkasaray food equipment and press line hydraulic systems use NBR cuffs. EPDM and food-grade silicone for sterilization equipment cylinders.

Yakkasaray District is Tashkent's business center with banks, shopping centers and service enterprises. Auto services and repair shops order oil-resistant NBR seals for engines and hydraulic systems, plus gaskets for building plumbing systems.

Delivery & production

Yakkasaray District · Delivery to Yakkasaray in 1 day

Manufactured in Tashkent. Delivery to Yakkasaray in 1 day. Packaging and handover time are agreed before dispatch.

Made at our own plant in Tashkent. Packaging and batch documents included.

Material selection by conditions

Short guide — full table on the product page

MediumTemperaturePressureMaterial
Hydraulic oil−30…+100 °Cup to 250 barNBR, polyurethane
Pneumatics, compressed air−20…+80 °Cup to 16 barNBR, EPDM
Emulsions, coolantup to +90 °Cup to 160 barNBR + PTFE lip

Full material selection table →

FAQ

Delivery, materials and lead times for your order

Pick a topic or open any question

After production, we send the order to Yakkasaray District by courier or carrier. Delivery to Yakkasaray in 1 day. Handover time is confirmed with the order; packaging and documents are included.

Depends on medium (oil, water, steam, chemicals), temperature and pressure. Send drawing or sample via WhatsApp — our engineer will select NBR, EPDM, Viton, silicone or polyurethane for your site in Yakkasaray District. Short guide table below; full grades on the product page.

Minimum quantity depends on the product and material. Standard lead time is 3–5 business days; a new mold usually requires 10–14 days. We confirm the exact schedule after reviewing the drawing or sample.

Yes. Send drawing, photos or the worn part via WhatsApp — we quote lead time, material and price. For plants in Yakkasaray District, photos with a scale and operating medium description are usually enough.

If the part does not match the approved drawing in dimensions and material, we rework at our cost. Before a production run we agree tolerances and inspection method.

Manufacturing and warehouse are in Tashkent. Delivery to Yakkasaray in 1 day. After production we hand over to a carrier or arrange courier delivery.