REZINA.UZ
ELASTIK FORM LLC
From idea to finished part.
Cuffs
from 100 pcsFrom 48 hoursDelivery to Termez in 2-3 daysQuality guarantee

Cuffs in Termez — NBR, EPDM, Viton / FKM, made in Tashkent

Manufacturing cuffs for Termez — from single samples to serial batches. We use NBR, EPDM, Viton / FKM, selecting the grade for your operating conditions. Delivery to Termez in 2-3 days. Termez is strong in border logistics and industry — for Cuffs we match rubber grades to actual operating conditions at regional sites.

Materials
NBREPDMViton / FKMPolyurethaneSilicone
Applications
  • Hydraulic cylinders
  • Pumps and compressors
  • Pneumatic systems
  • Rods and pistons
  • Industrial machines
Advantages
  • Precise dimensions by drawing
  • High wear resistance
  • High pressure operation
  • From 100 pcs
  • Import substitute

Termez industrial and logistics hydraulic and pneumatic systems — standard NBR and EPDM cuffs for pump and compressor units.

Surkhandarya is Uzbekistan's hottest area (up to +50°C in summer). Surkhandaryocement factories operate in abrasive dust and high heat, while cotton plants need seals for oil presses. We select heat-resistant EPDM and Viton grades designed for the extreme southern climate.

Delivery & production

Termez · Delivery to Termez in 2-3 days

Own factory in Tashkent. Delivery to Termez in 2-3 days. Reliable packaging, cargo tracking.

Made at our own plant in Tashkent. Packaging and batch documents included.

Material selection by conditions

Short guide — full table on the product page

MediumTemperaturePressureMaterial
Hydraulic oil−30…+100 °Cup to 250 barNBR, polyurethane
Pneumatics, compressed air−20…+80 °Cup to 16 barNBR, EPDM
Emulsions, coolantup to +90 °Cup to 160 barNBR + PTFE lip

Full material selection table →

FAQ

Delivery, materials and lead times for your order

Pick a topic or open any question

We manufacture in Tashkent and ship to Termez by transport company. Delivery to Termez in 2-3 days. Double packaging and cargo tracking.

Depends on medium (oil, water, steam, chemicals), temperature and pressure. Send drawing or sample via WhatsApp — our engineer will select NBR, EPDM, Viton, silicone or polyurethane for your site in Termez. Short guide table below; full grades on the product page.

From 100 pcs (or one batch for custom shapes). Lead time from 48 hours after drawing and material approval. For urgent orders to Termez, ask when ordering — we often accelerate using existing molds.

Yes. Send drawing, photos or the worn part via WhatsApp — we quote lead time, material and price. For plants in Termez, photos with a scale and operating medium description are usually enough.

If the part does not match the approved drawing in dimensions and material, we rework at our cost. Before a production run we agree tolerances and inspection method.

Manufacturing and warehouse are in Tashkent. Delivery to Termez in 2-3 days. After production we hand over to a carrier or arrange courier delivery.

HomeCatalog
BlogOrderContacts