REZINA.UZ
ELASTIK FORM
From idea to finished part.
Rubber Grades
from 20 kgStandard: 3–5 daysDelivery to Asaka in 1–2 daysQuality guarantee

Technical Rubber Grades in Asaka for your operating conditions

We select technical rubber grades for Asaka enterprises by temperature, pressure and operating medium. Available materials: NBR / HNBR — oil and fuel resistant, EPDM — steam, water, weather, UV, Viton / FKM — chemicals, acids, high temp. Delivery to Asaka in 1–2 days.

Materials
NBR / HNBR — oil and fuel resistantEPDM — steam, water, weather, UVViton / FKM — chemicals, acids, high tempSilicone VMQ / FVMQ — food, heat resistantCR (neoprene) — oil, fuel, ozonePTFE — extreme chemical resistance
Applications
  • Gasket and sealing material
  • Equipment vibration isolation
  • Vessel and tray lining
  • Leak and chemical protection
  • Food and pharmaceutical lines
Advantages
  • ✓Grade selection for oil, acid, steam or food media
  • ✓1000×1000 mm sheets and rolls, cut to drawing
  • ✓Shore A hardness 30–90
  • ✓Food and medical grade certificates available
  • ✓Import grade and compound substitution

For the Asaka car plant, NBR is recommended for engine oil, gearbox oil and hydraulics up to +120 °C. FKM for hot oil and the fuel circuit, EPDM for coolant and exterior seals.

Delivery & production

Asaka · Delivery to Asaka in 1–2 days

Manufactured in Tashkent. Delivery to Asaka in 1–2 days. Packaging and shipping method are agreed before dispatch.

Made at our own plant in Tashkent. Packaging and batch documents included.

Material selection by conditions

Short guide — full table on the product page

MediumTemperaturePressureMaterial
Oil, diesel, fuels−30…+120 °Cno pressure / gasketNBR, HNBR
Steam, hot water, weather−40…+150 °Cup to 16 barEPDM
Acids, alkalis, solventsup to +200 °Cup to 40 barViton / FKM

Full material selection table →

FAQ

Delivery, materials and lead times for your order

Pick a topic or open any question

We manufacture in Tashkent and ship to Asaka by transport company. Delivery to Asaka in 1–2 days. Double packaging and cargo tracking.

Depends on medium (oil, water, steam, chemicals), temperature and pressure. Send drawing or sample via WhatsApp — our engineer will select NBR, EPDM, Viton, silicone or polyurethane for your site in Asaka. Short guide table below; full grades on the product page.

Minimum quantity depends on the product and material. Standard lead time is 3–5 business days; a new mold usually requires 10–14 days. We confirm the exact schedule after reviewing the drawing or sample.

Yes. Send drawing, photos or the worn part via WhatsApp — we quote lead time, material and price. For plants in Asaka, photos with a scale and operating medium description are usually enough.

If the part does not match the approved drawing in dimensions and material, we rework at our cost. Before a production run we agree tolerances and inspection method.

Manufacturing and warehouse are in Tashkent. Delivery to Asaka in 1–2 days. After production we hand over to a carrier or arrange courier delivery.