REZINA.UZ
ELASTIK FORM
From idea to finished part.
Rubber Grades
from 20 kgStandard: 3–5 daysDelivery to Kattakurgan in 1–2 daysQuality guarantee

Technical Rubber Grades in Kattakurgan for your operating conditions

We select technical rubber grades for Kattakurgan enterprises by temperature, pressure and operating medium. Available materials: NBR / HNBR — oil and fuel resistant, EPDM — steam, water, weather, UV, Viton / FKM — chemicals, acids, high temp. Delivery to Kattakurgan in 1–2 days.

Materials
NBR / HNBR — oil and fuel resistantEPDM — steam, water, weather, UVViton / FKM — chemicals, acids, high tempSilicone VMQ / FVMQ — food, heat resistantCR (neoprene) — oil, fuel, ozonePTFE — extreme chemical resistance
Applications
  • Gasket and sealing material
  • Equipment vibration isolation
  • Vessel and tray lining
  • Leak and chemical protection
  • Food and pharmaceutical lines
Advantages
  • ✓Grade selection for oil, acid, steam or food media
  • ✓1000×1000 mm sheets and rolls, cut to drawing
  • ✓Shore A hardness 30–90
  • ✓Food and medical grade certificates available
  • ✓Import grade and compound substitution

For the Kattakurgan pump stations, EPDM is recommended for water, NBR for bearing oil and valve hydraulics. With silt and sand, a harder cuff lip is the better choice.

Delivery & production

Kattakurgan · Delivery to Kattakurgan in 1–2 days

Manufactured in Tashkent. Delivery to Kattakurgan in 1–2 days. Packaging and shipping method are agreed before dispatch.

Made at our own plant in Tashkent. Packaging and batch documents included.

Material selection by conditions

Short guide — full table on the product page

MediumTemperaturePressureMaterial
Oil, diesel, fuels−30…+120 °Cno pressure / gasketNBR, HNBR
Steam, hot water, weather−40…+150 °Cup to 16 barEPDM
Acids, alkalis, solventsup to +200 °Cup to 40 barViton / FKM

Full material selection table →

FAQ

Delivery, materials and lead times for your order

Pick a topic or open any question

We manufacture in Tashkent and ship to Kattakurgan by transport company. Delivery to Kattakurgan in 1–2 days. Double packaging and cargo tracking.

Depends on medium (oil, water, steam, chemicals), temperature and pressure. Send drawing or sample via WhatsApp — our engineer will select NBR, EPDM, Viton, silicone or polyurethane for your site in Kattakurgan. Short guide table below; full grades on the product page.

Minimum quantity depends on the product and material. Standard lead time is 3–5 business days; a new mold usually requires 10–14 days. We confirm the exact schedule after reviewing the drawing or sample.

Yes. Send drawing, photos or the worn part via WhatsApp — we quote lead time, material and price. For plants in Kattakurgan, photos with a scale and operating medium description are usually enough.

If the part does not match the approved drawing in dimensions and material, we rework at our cost. Before a production run we agree tolerances and inspection method.

Manufacturing and warehouse are in Tashkent. Delivery to Kattakurgan in 1–2 days. After production we hand over to a carrier or arrange courier delivery.