REZINA.UZ
ELASTIK FORM
From idea to finished part.
Rubber Grades
from 20 kgStandard: 3–5 daysDelivery to Khiva in 2–3 daysQuality guarantee

Technical Rubber Grades in Khiva for your operating conditions

We select technical rubber grades for Khiva enterprises by temperature, pressure and operating medium. Available materials: NBR / HNBR — oil and fuel resistant, EPDM — steam, water, weather, UV, Viton / FKM — chemicals, acids, high temp. Delivery to Khiva in 2–3 days.

Materials
NBR / HNBR — oil and fuel resistantEPDM — steam, water, weather, UVViton / FKM — chemicals, acids, high tempSilicone VMQ / FVMQ — food, heat resistantCR (neoprene) — oil, fuel, ozonePTFE — extreme chemical resistance
Applications
  • Gasket and sealing material
  • Equipment vibration isolation
  • Vessel and tray lining
  • Leak and chemical protection
  • Food and pharmaceutical lines
Advantages
  • ✓Grade selection for oil, acid, steam or food media
  • ✓1000×1000 mm sheets and rolls, cut to drawing
  • ✓Shore A hardness 30–90
  • ✓Food and medical grade certificates available
  • ✓Import grade and compound substitution

For pump stations in Khiva, EPDM is recommended for canal water, NBR or FKM for press oil if the joint is hot, silicone where the part touches the product.

Delivery & production

Khiva · Delivery to Khiva in 2–3 days

Manufactured in Tashkent. Delivery to Khiva in 2–3 days. Packaging and shipping method are agreed before dispatch.

Made at our own plant in Tashkent. Packaging and batch documents included.

Material selection by conditions

Short guide — full table on the product page

MediumTemperaturePressureMaterial
Oil, diesel, fuels−30…+120 °Cno pressure / gasketNBR, HNBR
Steam, hot water, weather−40…+150 °Cup to 16 barEPDM
Acids, alkalis, solventsup to +200 °Cup to 40 barViton / FKM

Full material selection table →

FAQ

Delivery, materials and lead times for your order

Pick a topic or open any question

We manufacture in Tashkent and ship to Khiva by transport company. Delivery to Khiva in 2–3 days. Double packaging and cargo tracking.

Depends on medium (oil, water, steam, chemicals), temperature and pressure. Send drawing or sample via WhatsApp — our engineer will select NBR, EPDM, Viton, silicone or polyurethane for your site in Khiva. Short guide table below; full grades on the product page.

Minimum quantity depends on the product and material. Standard lead time is 3–5 business days; a new mold usually requires 10–14 days. We confirm the exact schedule after reviewing the drawing or sample.

Yes. Send drawing, photos or the worn part via WhatsApp — we quote lead time, material and price. For plants in Khiva, photos with a scale and operating medium description are usually enough.

If the part does not match the approved drawing in dimensions and material, we rework at our cost. Before a production run we agree tolerances and inspection method.

Manufacturing and warehouse are in Tashkent. Delivery to Khiva in 2–3 days. After production we hand over to a carrier or arrange courier delivery.