REZINA.UZ
ELASTIK FORM
From idea to finished part.
Rubber Grades
from 20 kgStandard: 3–5 daysDelivery to Bektemir in 1 dayQuality guarantee

Technical Rubber Grades in Bektemir District, Tashkent for your operating conditions

We select technical rubber grades for Bektemir District enterprises by temperature, pressure and operating medium. Available materials: NBR / HNBR — oil and fuel resistant, EPDM — steam, water, weather, UV, Viton / FKM — chemicals, acids, high temp. Delivery to Bektemir in 1 day. Bektemir District is active in industrial zones; for Technical Rubber Grades we match materials to Bektemir industrial zones and factories operating conditions.

Materials
NBR / HNBR — oil and fuel resistantEPDM — steam, water, weather, UVViton / FKM — chemicals, acids, high tempSilicone VMQ / FVMQ — food, heat resistantCR (neoprene) — oil, fuel, ozonePTFE — extreme chemical resistance
Applications
  • Gasket and sealing material
  • Equipment vibration isolation
  • Vessel and tray lining
  • Leak and chemical protection
  • Food and pharmaceutical lines
Advantages
  • Grade selection for oil, acid, steam or food media
  • 1000×1000 mm sheets and rolls, cut to drawing
  • Shore A hardness 30–90
  • Food and medical grade certificates available
  • Import grade and compound substitution

Bektemir metalworking plants order NBR for coolant and oil systems, polyurethane for abrasive zones. HNBR at higher temperatures.

Bektemir District is in the industrial zone in eastern Tashkent. Metallurgical plants use heat-resistant Viton seals for furnaces, chemical factories use acid-resistant PTFE and EPDM gaskets. Machine-building plants create demand for a wide range of molded and pressed products.

Delivery & production

Bektemir District · Delivery to Bektemir in 1 day

Manufactured in Tashkent. Delivery to Bektemir in 1 day. Packaging and handover time are agreed before dispatch.

Made at our own plant in Tashkent. Packaging and batch documents included.

Material selection by conditions

Short guide — full table on the product page

MediumTemperaturePressureMaterial
Oil, diesel, fuels−30…+120 °Cno pressure / gasketNBR, HNBR
Steam, hot water, weather−40…+150 °Cup to 16 barEPDM
Acids, alkalis, solventsup to +200 °Cup to 40 barViton / FKM

Full material selection table →

FAQ

Delivery, materials and lead times for your order

Pick a topic or open any question

After production, we send the order to Bektemir District by courier or carrier. Delivery to Bektemir in 1 day. Handover time is confirmed with the order; packaging and documents are included.

Depends on medium (oil, water, steam, chemicals), temperature and pressure. Send drawing or sample via WhatsApp — our engineer will select NBR, EPDM, Viton, silicone or polyurethane for your site in Bektemir District. Short guide table below; full grades on the product page.

Minimum quantity depends on the product and material. Standard lead time is 3–5 business days; a new mold usually requires 10–14 days. We confirm the exact schedule after reviewing the drawing or sample.

Yes. Send drawing, photos or the worn part via WhatsApp — we quote lead time, material and price. For plants in Bektemir District, photos with a scale and operating medium description are usually enough.

If the part does not match the approved drawing in dimensions and material, we rework at our cost. Before a production run we agree tolerances and inspection method.

Manufacturing and warehouse are in Tashkent. Delivery to Bektemir in 1 day. After production we hand over to a carrier or arrange courier delivery.