REZINA.UZ
ELASTIK FORM LLC
From idea to finished part.
Gaskets
from 100 pcsFrom 48 hoursDelivery to Andijan in 1-2 daysQuality guarantee

Gaskets in Andijan — Urgent production from 48 hours

Material engineering for gaskets in Andijan: medium, temperature and pressure analysis → optimal grade from NBR, EPDM, Viton / FKM. Delivery to Andijan in 1-2 days. Fergana Valley industrial enterprises. Andijan is strong in automotive and electrical — for Gaskets we match rubber grades to actual operating conditions at regional sites.

Materials
NBR (oil-resistant)EPDM (heat-resistant)Viton / FKMSiliconeParonite
Applications
  • Flange connections
  • Heat exchangers
  • Pump equipment
  • Pipeline fittings
  • Food processing equipment
Advantages
  • Any geometry by drawing
  • Thickness from 0.5 mm
  • Material selection for environment
  • Orders from 100 pcs
  • Lead time from 48 hours

Andijan factory hydraulic presses and oil pumps use NBR gaskets. UzAuto conveyor lines use oil-resistant gaskets for transmission and gearbox systems.

Andijan region is Uzbekistan's machine-building center. UzAuto Motors, Andijankabel electrical plant and oil processing create steady demand for automotive seals, cable bushings and food-grade gaskets. We've worked with valley enterprises for over 3 years and understand each industry's requirements.

Delivery & production

Andijan · Delivery to Andijan in 1-2 days

Production in Tashkent. Delivery to Andijan in 1-2 days. Shipped by transport company, packaging included.

Made at our own plant in Tashkent. Packaging and batch documents included.

Material selection by conditions

Short guide — full table on the product page

MediumTemperaturePressureMaterial
Flange joints, water−20…+120 °Cup to 25 barEPDM, NBR
Petroleum, oilsup to +130 °Cup to 40 barNBR, Viton
Steam, hot waterup to +180 °Cup to 25 barEPDM, rubber sheet

Full material selection table →

FAQ

Delivery, materials and lead times for your order

Pick a topic or open any question

We manufacture in Tashkent and ship to Andijan by transport company. Delivery to Andijan in 1-2 days. Double packaging and cargo tracking.

Depends on medium (oil, water, steam, chemicals), temperature and pressure. Send drawing or sample via WhatsApp — our engineer will select NBR, EPDM, Viton, silicone or polyurethane for your site in Andijan. Short guide table below; full grades on the product page.

From 100 pcs (or one batch for custom shapes). Lead time from 48 hours after drawing and material approval. For urgent orders to Andijan, ask when ordering — we often accelerate using existing molds.

Yes. Send drawing, photos or the worn part via WhatsApp — we quote lead time, material and price. For plants in Andijan, photos with a scale and operating medium description are usually enough.

If the part does not match the approved drawing in dimensions and material, we rework at our cost. Before a production run we agree tolerances and inspection method.

Manufacturing and warehouse are in Tashkent. Delivery to Andijan in 1-2 days. After production we hand over to a carrier or arrange courier delivery.

HomeCatalog
BlogOrderContacts