REZINA.UZ
ELASTIK FORM
From idea to finished part.
Gaskets
from 100 pcsStandard: 3–5 daysDelivery to Kokand in 1–2 daysQuality guarantee

Custom Rubber Gaskets in Kokand

We take orders for rubber gaskets for plants in Kokand. Made to drawing, sample or dimensions at our Tashkent plant. Main materials: NBR, EPDM, Viton / FKM. Delivery to Kokand in 1–2 days.

Materials
NBR (oil-resistant)EPDM (heat-resistant)Viton / FKMSiliconeParonite
Applications
  • Flange connections
  • Heat exchangers
  • Pump equipment
  • Pipeline fittings
  • Food processing equipment
Advantages
  • ✓Any geometry by drawing
  • ✓Thickness from 0.5 mm
  • ✓Material selection for environment
  • ✓Orders from 100 pcs
  • ✓Standard lead time 3–5 business days

For the Kokand superphosphate plant, EPDM is recommended for water and weak acids, FKM for a hotter and more aggressive medium. EPDM and bushings for looms, silicone for food contact, NBR for oil.

Delivery & production

Kokand · Delivery to Kokand in 1–2 days

Manufactured in Tashkent. Delivery to Kokand in 1–2 days. Packaging and shipping method are agreed before dispatch.

Made at our own plant in Tashkent. Packaging and batch documents included.

Material selection by conditions

Short guide — full table on the product page

MediumTemperaturePressureMaterial
Flange joints, water−20…+120 °Cup to 25 barEPDM, NBR
Petroleum, oilsup to +130 °Cup to 40 barNBR, Viton
Steam, hot waterup to +180 °Cup to 25 barEPDM, rubber sheet

Full material selection table →

FAQ

Delivery, materials and lead times for your order

Pick a topic or open any question

We manufacture in Tashkent and ship to Kokand by transport company. Delivery to Kokand in 1–2 days. Double packaging and cargo tracking.

Depends on medium (oil, water, steam, chemicals), temperature and pressure. Send drawing or sample via WhatsApp — our engineer will select NBR, EPDM, Viton, silicone or polyurethane for your site in Kokand. Short guide table below; full grades on the product page.

Minimum quantity depends on the product and material. Standard lead time is 3–5 business days; a new mold usually requires 10–14 days. We confirm the exact schedule after reviewing the drawing or sample.

Yes. Send drawing, photos or the worn part via WhatsApp — we quote lead time, material and price. For plants in Kokand, photos with a scale and operating medium description are usually enough.

If the part does not match the approved drawing in dimensions and material, we rework at our cost. Before a production run we agree tolerances and inspection method.

Manufacturing and warehouse are in Tashkent. Delivery to Kokand in 1–2 days. After production we hand over to a carrier or arrange courier delivery.