REZINA.UZ
ELASTIK FORM
From idea to finished part.
Gaskets
from 100 pcsStandard: 3–5 daysDelivery to Namangan in 1-2 daysQuality guarantee

Custom Rubber Gaskets in Namangan

We manufacture rubber gaskets by drawing, sample or customer dimensions at our Tashkent production site. Main materials: NBR, EPDM, Viton / FKM. Delivery to Namangan in 1-2 days. We work with Namangan region enterprises. Namangan is strong in textile, leather and food — for Rubber Gaskets we match rubber grades to actual operating conditions at regional sites.

Materials
NBR (oil-resistant)EPDM (heat-resistant)Viton / FKMSiliconeParonite
Applications
  • Flange connections
  • Heat exchangers
  • Pump equipment
  • Pipeline fittings
  • Food processing equipment
Advantages
  • ✓Any geometry by drawing
  • ✓Thickness from 0.5 mm
  • ✓Material selection for environment
  • ✓Orders from 100 pcs
  • ✓Standard lead time 3–5 business days

Namangan silk factory dyeing machines need EPDM gaskets resistant to hot water and steam. Canning plants order silicone gaskets for food pipelines.

Namangan region specializes in light industry and agricultural processing. Silk mills need vibration-isolating bushings for looms, canning factories require food-grade silicone seals, and leather plants order chemical-resistant gaskets from EPDM and Viton. We select the optimal material for each application.

Delivery & production

Namangan · Delivery to Namangan in 1-2 days

Manufactured in Tashkent. Delivery to Namangan in 1-2 days. Packaging and shipping method are agreed before dispatch.

Made at our own plant in Tashkent. Packaging and batch documents included.

Material selection by conditions

Short guide — full table on the product page

MediumTemperaturePressureMaterial
Flange joints, water−20…+120 °Cup to 25 barEPDM, NBR
Petroleum, oilsup to +130 °Cup to 40 barNBR, Viton
Steam, hot waterup to +180 °Cup to 25 barEPDM, rubber sheet

Full material selection table →

FAQ

Delivery, materials and lead times for your order

Pick a topic or open any question

We manufacture in Tashkent and ship to Namangan by transport company. Delivery to Namangan in 1-2 days. Double packaging and cargo tracking.

Depends on medium (oil, water, steam, chemicals), temperature and pressure. Send drawing or sample via WhatsApp — our engineer will select NBR, EPDM, Viton, silicone or polyurethane for your site in Namangan. Short guide table below; full grades on the product page.

Minimum quantity depends on the product and material. Standard lead time is 3–5 business days; a new mold usually requires 10–14 days. We confirm the exact schedule after reviewing the drawing or sample.

Yes. Send drawing, photos or the worn part via WhatsApp — we quote lead time, material and price. For plants in Namangan, photos with a scale and operating medium description are usually enough.

If the part does not match the approved drawing in dimensions and material, we rework at our cost. Before a production run we agree tolerances and inspection method.

Manufacturing and warehouse are in Tashkent. Delivery to Namangan in 1-2 days. After production we hand over to a carrier or arrange courier delivery.