REZINA.UZ
ELASTIK FORM
From idea to finished part.
Gaskets
from 100 pcsStandard: 3–5 daysDelivery to Yangiyul in 1 dayQuality guarantee

Custom Rubber Gaskets in Yangiyul

We take orders for rubber gaskets for plants in Yangiyul. Made to drawing, sample or dimensions at our Tashkent plant. Main materials: NBR, EPDM, Viton / FKM. Delivery to Yangiyul in 1 day.

Materials
NBR (oil-resistant)EPDM (heat-resistant)Viton / FKMSiliconeParonite
Applications
  • Flange connections
  • Heat exchangers
  • Pump equipment
  • Pipeline fittings
  • Food processing equipment
Advantages
  • ✓Any geometry by drawing
  • ✓Thickness from 0.5 mm
  • ✓Material selection for environment
  • ✓Orders from 100 pcs
  • ✓Standard lead time 3–5 business days

For food lines in Yangiyul, silicone is recommended where the part touches the product, EPDM for steam and washdown. NBR for cotton-press oil up to +120 °C, FKM if the press runs hotter.

Delivery & production

Yangiyul · Delivery to Yangiyul in 1 day

Manufactured in Tashkent. Delivery to Yangiyul in 1 day. Packaging and shipping method are agreed before dispatch.

Made at our own plant in Tashkent. Packaging and batch documents included.

Material selection by conditions

Short guide — full table on the product page

MediumTemperaturePressureMaterial
Flange joints, water−20…+120 °Cup to 25 barEPDM, NBR
Petroleum, oilsup to +130 °Cup to 40 barNBR, Viton
Steam, hot waterup to +180 °Cup to 25 barEPDM, rubber sheet

Full material selection table →

FAQ

Delivery, materials and lead times for your order

Pick a topic or open any question

We manufacture in Tashkent and ship to Yangiyul by transport company. Delivery to Yangiyul in 1 day. Double packaging and cargo tracking.

Depends on medium (oil, water, steam, chemicals), temperature and pressure. Send drawing or sample via WhatsApp — our engineer will select NBR, EPDM, Viton, silicone or polyurethane for your site in Yangiyul. Short guide table below; full grades on the product page.

Minimum quantity depends on the product and material. Standard lead time is 3–5 business days; a new mold usually requires 10–14 days. We confirm the exact schedule after reviewing the drawing or sample.

Yes. Send drawing, photos or the worn part via WhatsApp — we quote lead time, material and price. For plants in Yangiyul, photos with a scale and operating medium description are usually enough.

If the part does not match the approved drawing in dimensions and material, we rework at our cost. Before a production run we agree tolerances and inspection method.

Manufacturing and warehouse are in Tashkent. Delivery to Yangiyul in 1 day. After production we hand over to a carrier or arrange courier delivery.