REZINA.UZ
ELASTIK FORM
From idea to finished part.
Rollers & Dampers
from 50 pcsStandard: 3–5 daysDelivery to Angren in 1 dayQuality guarantee

Custom Rubber Rollers and Dampers in Angren

We take orders for rubber rollers and dampers for plants in Angren. Made to drawing, sample or dimensions at our Tashkent plant. Main materials: NBR, EPDM, Silicone. Delivery to Angren in 1 day.

Materials
NBREPDMSiliconePolyurethaneNatural rubber
Applications
  • Conveyor systems
  • Printing equipment
  • Packaging lines
  • Textile machines
  • Industrial printers
Advantages
  • ✓Rubber coating of any diameter
  • ✓Shore A hardness: 30-90
  • ✓Precise balancing
  • ✓High wear resistance
  • ✓Import roller replacement

For the Angren coal pit and power plant, EPDM is recommended for water, steam and ash handling up to +150 °C. NBR for mill oil and hydraulics, FKM for a hot oil joint.

Delivery & production

Angren · Delivery to Angren in 1 day

Manufactured in Tashkent. Delivery to Angren in 1 day. Packaging and shipping method are agreed before dispatch.

Made at our own plant in Tashkent. Packaging and batch documents included.

Material selection by conditions

Short guide — full table on the product page

MediumTemperaturePressureMaterial
Conveyor, printing−20…+80 °CcontactNBR, CR (30–90 ShA)
Food equipmentup to +120 °CcontactSilicone, EPDM
Heavy loadsup to +60 °Cup to 50 kNPolyurethane

Full material selection table →

FAQ

Delivery, materials and lead times for your order

Pick a topic or open any question

We manufacture in Tashkent and ship to Angren by transport company. Delivery to Angren in 1 day. Double packaging and cargo tracking.

Depends on medium (oil, water, steam, chemicals), temperature and pressure. Send drawing or sample via WhatsApp — our engineer will select NBR, EPDM, Viton, silicone or polyurethane for your site in Angren. Short guide table below; full grades on the product page.

Minimum quantity depends on the product and material. Standard lead time is 3–5 business days; a new mold usually requires 10–14 days. We confirm the exact schedule after reviewing the drawing or sample.

Yes. Send drawing, photos or the worn part via WhatsApp — we quote lead time, material and price. For plants in Angren, photos with a scale and operating medium description are usually enough.

If the part does not match the approved drawing in dimensions and material, we rework at our cost. Before a production run we agree tolerances and inspection method.

Manufacturing and warehouse are in Tashkent. Delivery to Angren in 1 day. After production we hand over to a carrier or arrange courier delivery.