REZINA.UZ
ELASTIK FORM LLC
From idea to finished part.
Rollers & Dampers
from 100 pcsFrom 48 hoursDelivery to Bukhara in 1-2 daysQuality guarantee

Rollers & Dampers in Bukhara — NBR, EPDM, Silicone, made in Tashkent

Manufacturing rollers & dampers for Bukhara — from single samples to serial batches. We use NBR, EPDM, Silicone, selecting the grade for your operating conditions. Delivery to Bukhara in 1-2 days. Bukhara is strong in oil & gas and cotton processing — for Rollers & Dampers we match rubber grades to actual operating conditions at regional sites.

Materials
NBREPDMSiliconePolyurethaneNatural rubber
Applications
  • Conveyor systems
  • Printing equipment
  • Packaging lines
  • Textile machines
  • Industrial printers
Advantages
  • Rubber coating of any diameter
  • Shore A hardness: 30-90
  • Precise balancing
  • High wear resistance
  • Import roller replacement

Production in Tashkent. Delivery to Bukhara in 1-2 days. Shipped by transport company, packaging included.

Bukhara oil & gas and processing facilities use NBR oil-resistant coated rollers for conveyors transporting oil-bearing loads. NBR dampers for buffer zones.

Bukhara region is a major oil & gas center in Uzbekistan. The Bukhara refinery and dozens of gas extraction sites are located here. Cotton processing, leather and gold mining companies also create steady demand for oil-resistant seals, pump cuffs and molded parts.

Material selection by conditions

Guide by medium, temperature and pressure — exact quote after drawing

MediumTemperaturePressureMaterial
Conveyor, printing−20…+80 °CcontactNBR, CR (30–90 ShA)
Food equipmentup to +120 °CcontactSilicone, EPDM
Heavy loadsup to +60 °Cup to 50 kNPolyurethane
Abrasive environmentup to +70 °CcontactPolyurethane, CR

FAQ

Delivery, materials and lead times for your order

Pick a topic or open any question

We manufacture in Tashkent and ship to Bukhara by transport company. Delivery to Bukhara in 1-2 days. Double packaging and cargo tracking.

Depends on medium (oil, water, steam, chemicals), temperature and pressure. Send drawing or sample via Telegram — our engineer will select NBR, EPDM, Viton, silicone or polyurethane for your site in Bukhara. See the selection table below.

From 100 pcs (or one batch for custom shapes). Lead time from 48 hours after drawing and material approval. For urgent orders to Bukhara, ask when ordering — we often accelerate using existing molds.

HomeCatalog
BlogOrderContacts