REZINA.UZ
ELASTIK FORM LLC
From idea to finished part.
Rollers & Dampers
from 100 pcsFrom 48 hoursDelivery to Fergana in 1-2 daysQuality guarantee

Buy Rollers & Dampers in Fergana — From 100 pcs, from 48h

Import replacement rollers & dampers for Fergana enterprises. By sample or drawing from NBR, EPDM, Silicone. Delivery to Fergana in 1-2 days. Supplying Fergana region production facilities. Fergana is strong in petrochemicals and chemicals — for Rollers & Dampers we match rubber grades to actual operating conditions at regional sites.

Materials
NBREPDMSiliconePolyurethaneNatural rubber
Applications
  • Conveyor systems
  • Printing equipment
  • Packaging lines
  • Textile machines
  • Industrial printers
Advantages
  • Rubber coating of any diameter
  • Shore A hardness: 30-90
  • Precise balancing
  • High wear resistance
  • Import roller replacement

Own factory in Tashkent. Delivery to Fergana in 1-2 days. Reliable packaging, cargo tracking.

Fergana petrochemical conveyor rollers use CR and Viton chemical-resistant coating. Pipeline compensator dampers — polyurethane and NBR.

Fergana region is Uzbekistan's chemical industry center. The Fergana refinery and Fergana-Azot have strict requirements for seal chemical resistance. We select materials (Viton, FKM, PTFE) for aggressive media at temperatures up to +250°C, ensuring long part service life.

Material selection by conditions

Guide by medium, temperature and pressure — exact quote after drawing

MediumTemperaturePressureMaterial
Conveyor, printing−20…+80 °CcontactNBR, CR (30–90 ShA)
Food equipmentup to +120 °CcontactSilicone, EPDM
Heavy loadsup to +60 °Cup to 50 kNPolyurethane
Abrasive environmentup to +70 °CcontactPolyurethane, CR

FAQ

Delivery, materials and lead times for your order

Pick a topic or open any question

We manufacture in Tashkent and ship to Fergana by transport company. Delivery to Fergana in 1-2 days. Double packaging and cargo tracking.

Depends on medium (oil, water, steam, chemicals), temperature and pressure. Send drawing or sample via Telegram — our engineer will select NBR, EPDM, Viton, silicone or polyurethane for your site in Fergana. See the selection table below.

From 100 pcs (or one batch for custom shapes). Lead time from 48 hours after drawing and material approval. For urgent orders to Fergana, ask when ordering — we often accelerate using existing molds.

HomeCatalog
BlogOrderContacts