REZINA.UZ
ELASTIK FORM LLC
From idea to finished part.
Rollers & Dampers
from 100 pcsFrom 48 hoursDelivery to Namangan in 1-2 daysQuality guarantee

Rollers & Dampers in Namangan — Urgent production from 48 hours

We manufacture rollers & dampers and deliver to Namangan. Production by drawing, sample or your dimensions from NBR, EPDM, Silicone. Delivery to Namangan in 1-2 days. We work with Namangan region enterprises. Namangan is strong in textile, leather and food — for Rollers & Dampers we match rubber grades to actual operating conditions at regional sites.

Materials
NBREPDMSiliconePolyurethaneNatural rubber
Applications
  • Conveyor systems
  • Printing equipment
  • Packaging lines
  • Textile machines
  • Industrial printers
Advantages
  • Rubber coating of any diameter
  • Shore A hardness: 30-90
  • Precise balancing
  • High wear resistance
  • Import roller replacement

Manufactured in Tashkent. Delivery to Namangan in 1-2 days. Packed in corrugated cardboard and stretch film.

Namangan dyeing and finishing machine press rollers need EPDM chemical-resistant coating 40–55 ShA. Silk rollers — soft silicone 25–35 ShA for minimal pressure.

Namangan region specializes in light industry and agricultural processing. Silk mills need vibration-isolating bushings for looms, canning factories require food-grade silicone seals, and leather plants order chemical-resistant gaskets from EPDM and Viton. We select the optimal material for each application.

Material selection by conditions

Guide by medium, temperature and pressure — exact quote after drawing

MediumTemperaturePressureMaterial
Conveyor, printing−20…+80 °CcontactNBR, CR (30–90 ShA)
Food equipmentup to +120 °CcontactSilicone, EPDM
Heavy loadsup to +60 °Cup to 50 kNPolyurethane
Abrasive environmentup to +70 °CcontactPolyurethane, CR

FAQ

Delivery, materials and lead times for your order

Pick a topic or open any question

We manufacture in Tashkent and ship to Namangan by transport company. Delivery to Namangan in 1-2 days. Double packaging and cargo tracking.

Depends on medium (oil, water, steam, chemicals), temperature and pressure. Send drawing or sample via Telegram — our engineer will select NBR, EPDM, Viton, silicone or polyurethane for your site in Namangan. See the selection table below.

From 100 pcs (or one batch for custom shapes). Lead time from 48 hours after drawing and material approval. For urgent orders to Namangan, ask when ordering — we often accelerate using existing molds.

HomeCatalog
BlogOrderContacts