REZINA.UZ
ELASTIK FORM
From idea to finished part.
Rollers & Dampers
from 50 pcsStandard: 3–5 daysDelivery to Navoi in 1-2 daysQuality guarantee

Custom Rubber Rollers and Dampers in Navoi

We manufacture rubber rollers and dampers by drawing, sample or customer dimensions at our Tashkent production site. Main materials: NBR, EPDM, Silicone. Delivery to Navoi in 1-2 days. We work with Navoi region mining and industrial enterprises. Navoi is strong in mining and metallurgy — for Rubber Rollers and Dampers we match rubber grades to actual operating conditions at regional sites.

Materials
NBREPDMSiliconePolyurethaneNatural rubber
Applications
  • Conveyor systems
  • Printing equipment
  • Packaging lines
  • Textile machines
  • Industrial printers
Advantages
  • ✓Rubber coating of any diameter
  • ✓Shore A hardness: 30-90
  • ✓Precise balancing
  • ✓High wear resistance
  • ✓Import roller replacement

Navoi MMC mining factory conveyors handle abrasive ores and rock. High-hardness polyurethane rollers Shore A 90–95 and large dampers for loading points.

Navoi region is Uzbekistan's mining heartland. Navoi MMC (Central Asia's largest gold and uranium producer) operates thousands of heavy equipment units requiring bushing, damper and seal replacement. We manufacture parts from high-strength polyurethane and Viton that withstand abrasive mining conditions.

Delivery & production

Navoi · Delivery to Navoi in 1-2 days

Manufactured in Tashkent. Delivery to Navoi in 1-2 days. Packaging and shipping method are agreed before dispatch.

Made at our own plant in Tashkent. Packaging and batch documents included.

Material selection by conditions

Short guide — full table on the product page

MediumTemperaturePressureMaterial
Conveyor, printing−20…+80 °CcontactNBR, CR (30–90 ShA)
Food equipmentup to +120 °CcontactSilicone, EPDM
Heavy loadsup to +60 °Cup to 50 kNPolyurethane

Full material selection table →

FAQ

Delivery, materials and lead times for your order

Pick a topic or open any question

We manufacture in Tashkent and ship to Navoi by transport company. Delivery to Navoi in 1-2 days. Double packaging and cargo tracking.

Depends on medium (oil, water, steam, chemicals), temperature and pressure. Send drawing or sample via WhatsApp — our engineer will select NBR, EPDM, Viton, silicone or polyurethane for your site in Navoi. Short guide table below; full grades on the product page.

Minimum quantity depends on the product and material. Standard lead time is 3–5 business days; a new mold usually requires 10–14 days. We confirm the exact schedule after reviewing the drawing or sample.

Yes. Send drawing, photos or the worn part via WhatsApp — we quote lead time, material and price. For plants in Navoi, photos with a scale and operating medium description are usually enough.

If the part does not match the approved drawing in dimensions and material, we rework at our cost. Before a production run we agree tolerances and inspection method.

Manufacturing and warehouse are in Tashkent. Delivery to Navoi in 1-2 days. After production we hand over to a carrier or arrange courier delivery.