REZINA.UZ
ELASTIK FORM LLC
From idea to finished part.
Rollers & Dampers
from 100 pcsFrom 48 hoursDelivery to Navoi in 1-2 daysQuality guarantee

Rollers & Dampers factory for Navoi — Full cycle & delivery

Material engineering for rollers & dampers in Navoi: medium, temperature and pressure analysis → optimal grade from NBR, EPDM, Silicone. Delivery to Navoi in 1-2 days. Navoi region mining and industrial enterprises. Navoi is strong in mining and metallurgy — for Rollers & Dampers we match rubber grades to actual operating conditions at regional sites.

Materials
NBREPDMSiliconePolyurethaneNatural rubber
Applications
  • Conveyor systems
  • Printing equipment
  • Packaging lines
  • Textile machines
  • Industrial printers
Advantages
  • Rubber coating of any diameter
  • Shore A hardness: 30-90
  • Precise balancing
  • High wear resistance
  • Import roller replacement

Own factory in Tashkent. Delivery to Navoi in 1-2 days. Reliable packaging, cargo tracking.

Navoi MMC mining factory conveyors handle abrasive ores and rock. High-hardness polyurethane rollers Shore A 90–95 and large dampers for loading points.

Navoi region is Uzbekistan's mining heartland. Navoi MMC (Central Asia's largest gold and uranium producer) operates thousands of heavy equipment units requiring bushing, damper and seal replacement. We manufacture parts from high-strength polyurethane and Viton that withstand abrasive mining conditions.

Material selection by conditions

Guide by medium, temperature and pressure — exact quote after drawing

MediumTemperaturePressureMaterial
Conveyor, printing−20…+80 °CcontactNBR, CR (30–90 ShA)
Food equipmentup to +120 °CcontactSilicone, EPDM
Heavy loadsup to +60 °Cup to 50 kNPolyurethane
Abrasive environmentup to +70 °CcontactPolyurethane, CR

FAQ

Delivery, materials and lead times for your order

Pick a topic or open any question

We manufacture in Tashkent and ship to Navoi by transport company. Delivery to Navoi in 1-2 days. Double packaging and cargo tracking.

Depends on medium (oil, water, steam, chemicals), temperature and pressure. Send drawing or sample via Telegram — our engineer will select NBR, EPDM, Viton, silicone or polyurethane for your site in Navoi. See the selection table below.

From 100 pcs (or one batch for custom shapes). Lead time from 48 hours after drawing and material approval. For urgent orders to Navoi, ask when ordering — we often accelerate using existing molds.

HomeCatalog
BlogOrderContacts