REZINA.UZ
ELASTIK FORM LLC
From idea to finished part.
Rollers & Dampers
from 100 pcsFrom 48 hoursDelivery to Nukus in 2-3 daysQuality guarantee

Rollers & Dampers in Nukus — NBR, EPDM, Silicone, made in Tashkent

Streamlined logistics to Nukus: packaging, labeling, batch documents. rollers & dampers from NBR, EPDM, Silicone, Tashkent factory. Delivery to Nukus in 2-3 days. Nukus is strong in irrigation and gas production — for Rollers & Dampers we match rubber grades to actual operating conditions at regional sites.

Materials
NBREPDMSiliconePolyurethaneNatural rubber
Applications
  • Conveyor systems
  • Printing equipment
  • Packaging lines
  • Textile machines
  • Industrial printers
Advantages
  • Rubber coating of any diameter
  • Shore A hardness: 30-90
  • Precise balancing
  • High wear resistance
  • Import roller replacement

Manufactured in Tashkent. Delivery to Nukus in 2-3 days. Packed in corrugated cardboard and stretch film.

Karakalpakstan irrigation and agribusiness grain and cotton conveyors use NR and SBR coated rollers for gentle bulk cargo handling.

Karakalpakstan has an extensive irrigation system and gas extraction facilities. Aral region pump stations, water treatment plants and gas compressors need EPDM (water-resistant) and NBR (oil-resistant) seals. Distance from Tashkent is offset by our streamlined logistics and double packaging.

Material selection by conditions

Guide by medium, temperature and pressure — exact quote after drawing

MediumTemperaturePressureMaterial
Conveyor, printing−20…+80 °CcontactNBR, CR (30–90 ShA)
Food equipmentup to +120 °CcontactSilicone, EPDM
Heavy loadsup to +60 °Cup to 50 kNPolyurethane
Abrasive environmentup to +70 °CcontactPolyurethane, CR

FAQ

Delivery, materials and lead times for your order

Pick a topic or open any question

We manufacture in Tashkent and ship to Nukus by transport company. Delivery to Nukus in 2-3 days. Double packaging and cargo tracking.

Depends on medium (oil, water, steam, chemicals), temperature and pressure. Send drawing or sample via Telegram — our engineer will select NBR, EPDM, Viton, silicone or polyurethane for your site in Nukus. See the selection table below.

From 100 pcs (or one batch for custom shapes). Lead time from 48 hours after drawing and material approval. For urgent orders to Nukus, ask when ordering — we often accelerate using existing molds.

HomeCatalog
BlogOrderContacts