REZINA.UZ
ELASTIK FORM
From idea to finished part.
Rollers & Dampers
from 50 pcsStandard: 3–5 daysDelivery to Nurafshon in 1 dayQuality guarantee

Custom Rubber Rollers and Dampers in Nurafshon

We take orders for rubber rollers and dampers for plants in Nurafshon. Made to drawing, sample or dimensions at our Tashkent plant. Main materials: NBR, EPDM, Silicone. Delivery to Nurafshon in 1 day.

Materials
NBREPDMSiliconePolyurethaneNatural rubber
Applications
  • Conveyor systems
  • Printing equipment
  • Packaging lines
  • Textile machines
  • Industrial printers
Advantages
  • ✓Rubber coating of any diameter
  • ✓Shore A hardness: 30-90
  • ✓Precise balancing
  • ✓High wear resistance
  • ✓Import roller replacement

For food plants in Nurafshon, silicone is recommended where the part touches the product, EPDM for water and heating, NBR for construction-equipment hydraulics. There is no large metals or gas plant in the city.

Delivery & production

Nurafshon · Delivery to Nurafshon in 1 day

Manufactured in Tashkent. Delivery to Nurafshon in 1 day. Packaging and shipping method are agreed before dispatch.

Made at our own plant in Tashkent. Packaging and batch documents included.

Material selection by conditions

Short guide — full table on the product page

MediumTemperaturePressureMaterial
Conveyor, printing−20…+80 °CcontactNBR, CR (30–90 ShA)
Food equipmentup to +120 °CcontactSilicone, EPDM
Heavy loadsup to +60 °Cup to 50 kNPolyurethane

Full material selection table →

FAQ

Delivery, materials and lead times for your order

Pick a topic or open any question

We manufacture in Tashkent and ship to Nurafshon by transport company. Delivery to Nurafshon in 1 day. Double packaging and cargo tracking.

Depends on medium (oil, water, steam, chemicals), temperature and pressure. Send drawing or sample via WhatsApp — our engineer will select NBR, EPDM, Viton, silicone or polyurethane for your site in Nurafshon. Short guide table below; full grades on the product page.

Minimum quantity depends on the product and material. Standard lead time is 3–5 business days; a new mold usually requires 10–14 days. We confirm the exact schedule after reviewing the drawing or sample.

Yes. Send drawing, photos or the worn part via WhatsApp — we quote lead time, material and price. For plants in Nurafshon, photos with a scale and operating medium description are usually enough.

If the part does not match the approved drawing in dimensions and material, we rework at our cost. Before a production run we agree tolerances and inspection method.

Manufacturing and warehouse are in Tashkent. Delivery to Nurafshon in 1 day. After production we hand over to a carrier or arrange courier delivery.