REZINA.UZ
ELASTIK FORM LLC
From idea to finished part.
Rollers & Dampers
from 100 pcsFrom 48 hoursDelivery to Almazar in 1 dayQuality guarantee

Rollers & Dampers in Almazar District, Tashkent — Production & Delivery

Import replacement rollers & dampers for textile mills and production bases in Almazar District. From NBR, EPDM, Silicone. Delivery to Almazar in 1 day. Almazar District is active in textile mills; for Rollers & Dampers we match materials to Almazar textile mills and production bases operating conditions.

Materials
NBREPDMSiliconePolyurethaneNatural rubber
Applications
  • Conveyor systems
  • Printing equipment
  • Packaging lines
  • Textile machines
  • Industrial printers
Advantages
  • Rubber coating of any diameter
  • Shore A hardness: 30-90
  • Precise balancing
  • High wear resistance
  • Import roller replacement

We deliver to Almazar District same day or next day. Proper packaging, documentation for every batch.

Almazar textile mills use EPDM-coated press and tension rollers 40–60 ShA. Dyeing bath rollers — CR and Viton.

Almazar District is Tashkent's heavy industry and construction center. Construction companies order hydraulic seals for special equipment, transport bases order oil seals and cuffs for trucks, factories order rings and gaskets for process equipment.

Material selection by conditions

Guide by medium, temperature and pressure — exact quote after drawing

MediumTemperaturePressureMaterial
Conveyor, printing−20…+80 °CcontactNBR, CR (30–90 ShA)
Food equipmentup to +120 °CcontactSilicone, EPDM
Heavy loadsup to +60 °Cup to 50 kNPolyurethane
Abrasive environmentup to +70 °CcontactPolyurethane, CR

FAQ

Delivery, materials and lead times for your order

Pick a topic or open any question

Our factory is in Tashkent — we deliver to Almazar District same day or next morning by courier or carrier. Delivery to Almazar in 1 day. Packaging and documents for every batch.

Depends on medium (oil, water, steam, chemicals), temperature and pressure. Send drawing or sample via Telegram — our engineer will select NBR, EPDM, Viton, silicone or polyurethane for your site in Almazar District. See the selection table below.

From 100 pcs (or one batch for custom shapes). Lead time from 48 hours after drawing and material approval. For urgent orders to Almazar District, ask when ordering — we often accelerate using existing molds.

HomeCatalog
BlogOrderContacts