REZINA.UZ
ELASTIK FORM
From idea to finished part.
Rollers & Dampers
from 50 pcsStandard: 3–5 daysDelivery to Yakkasaray in 1 dayQuality guarantee

Custom Rubber Rollers and Dampers in Yakkasaray District, Tashkent

We manufacture rubber rollers and dampers by drawing, sample or customer dimensions at our Tashkent production site. Main materials: NBR, EPDM, Silicone. Delivery to Yakkasaray in 1 day. We work with food plants and warehouse complexes. Yakkasaray District is active in food and warehousing; for Rubber Rollers and Dampers we match materials to Yakkasaray food plants and warehouses operating conditions.

Materials
NBREPDMSiliconePolyurethaneNatural rubber
Applications
  • Conveyor systems
  • Printing equipment
  • Packaging lines
  • Textile machines
  • Industrial printers
Advantages
  • ✓Rubber coating of any diameter
  • ✓Shore A hardness: 30-90
  • ✓Precise balancing
  • ✓High wear resistance
  • ✓Import roller replacement

Yakkasaray food plant lines use food-grade silicone and EPDM rollers. Warehouse conveyors — NR/SBR rollers with up to 500 kg load per roller.

Yakkasaray District is Tashkent's business center with banks, shopping centers and service enterprises. Auto services and repair shops order oil-resistant NBR seals for engines and hydraulic systems, plus gaskets for building plumbing systems.

Delivery & production

Yakkasaray District · Delivery to Yakkasaray in 1 day

Manufactured in Tashkent. Delivery to Yakkasaray in 1 day. Packaging and handover time are agreed before dispatch.

Made at our own plant in Tashkent. Packaging and batch documents included.

Material selection by conditions

Short guide — full table on the product page

MediumTemperaturePressureMaterial
Conveyor, printing−20…+80 °CcontactNBR, CR (30–90 ShA)
Food equipmentup to +120 °CcontactSilicone, EPDM
Heavy loadsup to +60 °Cup to 50 kNPolyurethane

Full material selection table →

FAQ

Delivery, materials and lead times for your order

Pick a topic or open any question

After production, we send the order to Yakkasaray District by courier or carrier. Delivery to Yakkasaray in 1 day. Handover time is confirmed with the order; packaging and documents are included.

Depends on medium (oil, water, steam, chemicals), temperature and pressure. Send drawing or sample via WhatsApp — our engineer will select NBR, EPDM, Viton, silicone or polyurethane for your site in Yakkasaray District. Short guide table below; full grades on the product page.

Minimum quantity depends on the product and material. Standard lead time is 3–5 business days; a new mold usually requires 10–14 days. We confirm the exact schedule after reviewing the drawing or sample.

Yes. Send drawing, photos or the worn part via WhatsApp — we quote lead time, material and price. For plants in Yakkasaray District, photos with a scale and operating medium description are usually enough.

If the part does not match the approved drawing in dimensions and material, we rework at our cost. Before a production run we agree tolerances and inspection method.

Manufacturing and warehouse are in Tashkent. Delivery to Yakkasaray in 1 day. After production we hand over to a carrier or arrange courier delivery.