REZINA.UZ
ELASTIK FORM
From idea to finished part.
Rollers & Dampers
from 50 pcsStandard: 3–5 daysDelivery to Samarkand in 1-2 daysQuality guarantee

Custom Rubber Rollers and Dampers in Samarkand

We manufacture rubber rollers and dampers by drawing, sample or customer dimensions at our Tashkent production site. Main materials: NBR, EPDM, Silicone. Delivery to Samarkand in 1-2 days. We work with Samarkand region enterprises. Samarkand is strong in textile, processing and agrochemicals — for Rubber Rollers and Dampers we match rubber grades to actual operating conditions at regional sites.

Materials
NBREPDMSiliconePolyurethaneNatural rubber
Applications
  • Conveyor systems
  • Printing equipment
  • Packaging lines
  • Textile machines
  • Industrial printers
Advantages
  • Rubber coating of any diameter
  • Shore A hardness: 30-90
  • Precise balancing
  • High wear resistance
  • Import roller replacement

Samarkand textile and knitting machines use press and guide rollers with soft silicone coating 30–45 ShA for gentle fabric transport without damage.

Samarkand region is a leading agricultural and processing hub. Large textile mills, fruit processing plants and building materials factories actively use sealing rings, pipeline gaskets and food-grade silicone elements. We regularly ship to Samarkand and know the region's logistics well.

Delivery & production

Samarkand · Delivery to Samarkand in 1-2 days

Manufactured in Tashkent. Delivery to Samarkand in 1-2 days. Packaging and shipping method are agreed before dispatch.

Made at our own plant in Tashkent. Packaging and batch documents included.

Material selection by conditions

Short guide — full table on the product page

MediumTemperaturePressureMaterial
Conveyor, printing−20…+80 °CcontactNBR, CR (30–90 ShA)
Food equipmentup to +120 °CcontactSilicone, EPDM
Heavy loadsup to +60 °Cup to 50 kNPolyurethane

Full material selection table →

FAQ

Delivery, materials and lead times for your order

Pick a topic or open any question

We manufacture in Tashkent and ship to Samarkand by transport company. Delivery to Samarkand in 1-2 days. Double packaging and cargo tracking.

Depends on medium (oil, water, steam, chemicals), temperature and pressure. Send drawing or sample via WhatsApp — our engineer will select NBR, EPDM, Viton, silicone or polyurethane for your site in Samarkand. Short guide table below; full grades on the product page.

Minimum quantity depends on the product and material. Standard lead time is 3–5 business days; a new mold usually requires 10–14 days. We confirm the exact schedule after reviewing the drawing or sample.

Yes. Send drawing, photos or the worn part via WhatsApp — we quote lead time, material and price. For plants in Samarkand, photos with a scale and operating medium description are usually enough.

If the part does not match the approved drawing in dimensions and material, we rework at our cost. Before a production run we agree tolerances and inspection method.

Manufacturing and warehouse are in Tashkent. Delivery to Samarkand in 1-2 days. After production we hand over to a carrier or arrange courier delivery.