REZINA.UZ
ELASTIK FORM
From idea to finished part.
Oil Seals
from 100 pcsStandard: 3–5 daysDelivery to Andijan in 1-2 daysQuality guarantee

Custom Oil Seals in Andijan

We manufacture oil seals by drawing, sample or customer dimensions at our Tashkent production site. Main materials: NBR, Viton / FKM, PTFE. Delivery to Andijan in 1-2 days. We work with Fergana Valley industrial enterprises. Andijan is strong in automotive and electrical — for Oil Seals we match rubber grades to actual operating conditions at regional sites.

Materials
NBR (oil-resistant)Viton / FKMPTFESiliconePolyurethane
Applications
  • Gearboxes
  • Pumps
  • Compressors
  • Electric motors
  • Transmissions
Advantages
  • Reinforced and frameless
  • Operating up to +250°C (Viton)
  • High sealing performance
  • Import substitute
  • From 100 pcs

UzAuto Andijan vehicle engines and transmissions need NBR oil seals for oil media. OEM size ranges: crankshaft, camshaft, axle — ±0.1 mm accuracy.

Andijan region is Uzbekistan's machine-building center. UzAuto Motors, Andijankabel electrical plant and oil processing create steady demand for automotive seals, cable bushings and food-grade gaskets. We've worked with valley enterprises for over 3 years and understand each industry's requirements.

Delivery & production

Andijan · Delivery to Andijan in 1-2 days

Manufactured in Tashkent. Delivery to Andijan in 1-2 days. Packaging and shipping method are agreed before dispatch.

Made at our own plant in Tashkent. Packaging and batch documents included.

Material selection by conditions

Short guide — full table on the product page

MediumTemperaturePressureMaterial
Engine oil, fuels−30…+120 °Cup to 0.5 barNBR + spring frame
Transmission oilup to +130 °Cup to 1 barNBR, FKM
Chemicals, steamup to +200 °Cup to 2 barViton / FKM, PTFE lip

Full material selection table →

FAQ

Delivery, materials and lead times for your order

Pick a topic or open any question

We manufacture in Tashkent and ship to Andijan by transport company. Delivery to Andijan in 1-2 days. Double packaging and cargo tracking.

Depends on medium (oil, water, steam, chemicals), temperature and pressure. Send drawing or sample via WhatsApp — our engineer will select NBR, EPDM, Viton, silicone or polyurethane for your site in Andijan. Short guide table below; full grades on the product page.

Minimum quantity depends on the product and material. Standard lead time is 3–5 business days; a new mold usually requires 10–14 days. We confirm the exact schedule after reviewing the drawing or sample.

Yes. Send drawing, photos or the worn part via WhatsApp — we quote lead time, material and price. For plants in Andijan, photos with a scale and operating medium description are usually enough.

If the part does not match the approved drawing in dimensions and material, we rework at our cost. Before a production run we agree tolerances and inspection method.

Manufacturing and warehouse are in Tashkent. Delivery to Andijan in 1-2 days. After production we hand over to a carrier or arrange courier delivery.