REZINA.UZ
ELASTIK FORM LLC
From idea to finished part.
Oil Seals
from 100 pcsFrom 48 hoursDelivery to Nukus in 2-3 daysQuality guarantee

Oil Seals in Nukus — Production & Delivery

Import replacement oil seals for Nukus enterprises. By sample or drawing from NBR, Viton / FKM, PTFE. Delivery to Nukus in 2-3 days. Supplying Karakalpakstan enterprises. Nukus is strong in irrigation and gas production — for Oil Seals we match rubber grades to actual operating conditions at regional sites.

Materials
NBR (oil-resistant)Viton / FKMPTFESiliconePolyurethane
Applications
  • Gearboxes
  • Pumps
  • Compressors
  • Electric motors
  • Transmissions
Advantages
  • Reinforced and frameless
  • Operating up to +250°C (Viton)
  • High sealing performance
  • Import substitute
  • From 100 pcs

Manufactured in Tashkent. Delivery to Nukus in 2-3 days. Packed in corrugated cardboard and stretch film.

Karakalpakstan water intake and irrigation station pumps use EPDM oil seals for water media. Gas production units — reinforced NBR at up to 1 bar.

Karakalpakstan has an extensive irrigation system and gas extraction facilities. Aral region pump stations, water treatment plants and gas compressors need EPDM (water-resistant) and NBR (oil-resistant) seals. Distance from Tashkent is offset by our streamlined logistics and double packaging.

Material selection by conditions

Guide by medium, temperature and pressure — exact quote after drawing

MediumTemperaturePressureMaterial
Engine oil, fuels−30…+120 °Cup to 0.5 barNBR + spring frame
Transmission oilup to +130 °Cup to 1 barNBR, FKM
Chemicals, steamup to +200 °Cup to 2 barViton / FKM, PTFE lip
High speed (up to 5000 RPM)up to +110 °Cup to 0.3 barNBR + PTFE

FAQ

Delivery, materials and lead times for your order

Pick a topic or open any question

We manufacture in Tashkent and ship to Nukus by transport company. Delivery to Nukus in 2-3 days. Double packaging and cargo tracking.

Depends on medium (oil, water, steam, chemicals), temperature and pressure. Send drawing or sample via Telegram — our engineer will select NBR, EPDM, Viton, silicone or polyurethane for your site in Nukus. See the selection table below.

From 100 pcs (or one batch for custom shapes). Lead time from 48 hours after drawing and material approval. For urgent orders to Nukus, ask when ordering — we often accelerate using existing molds.

HomeCatalog
BlogOrderContacts