REZINA.UZ
ELASTIK FORM
From idea to finished part.
Oil Seals
from 100 pcsStandard: 3–5 daysDelivery to Bektemir in 1 dayQuality guarantee

Custom Oil Seals in Bektemir District, Tashkent

We manufacture oil seals by drawing, sample or customer dimensions at our Tashkent production site. Main materials: NBR, Viton / FKM, PTFE. Delivery to Bektemir in 1 day. We work with industrial-zone enterprises. Bektemir District is active in industrial zones; for Oil Seals we match materials to Bektemir industrial zones and factories operating conditions.

Materials
NBR (oil-resistant)Viton / FKMPTFESiliconePolyurethane
Applications
  • Gearboxes
  • Pumps
  • Compressors
  • Electric motors
  • Transmissions
Advantages
  • Reinforced and frameless
  • Operating up to +250°C (Viton)
  • High sealing performance
  • Import substitute
  • From 100 pcs

Bektemir industrial zone metalworking plant gearboxes and hydraulic stations consume NBR oil seals in high volumes. Spring steel reinforced, up to 0.5 bar and 3000 RPM.

Bektemir District is in the industrial zone in eastern Tashkent. Metallurgical plants use heat-resistant Viton seals for furnaces, chemical factories use acid-resistant PTFE and EPDM gaskets. Machine-building plants create demand for a wide range of molded and pressed products.

Delivery & production

Bektemir District · Delivery to Bektemir in 1 day

Manufactured in Tashkent. Delivery to Bektemir in 1 day. Packaging and handover time are agreed before dispatch.

Made at our own plant in Tashkent. Packaging and batch documents included.

Material selection by conditions

Short guide — full table on the product page

MediumTemperaturePressureMaterial
Engine oil, fuels−30…+120 °Cup to 0.5 barNBR + spring frame
Transmission oilup to +130 °Cup to 1 barNBR, FKM
Chemicals, steamup to +200 °Cup to 2 barViton / FKM, PTFE lip

Full material selection table →

FAQ

Delivery, materials and lead times for your order

Pick a topic or open any question

After production, we send the order to Bektemir District by courier or carrier. Delivery to Bektemir in 1 day. Handover time is confirmed with the order; packaging and documents are included.

Depends on medium (oil, water, steam, chemicals), temperature and pressure. Send drawing or sample via WhatsApp — our engineer will select NBR, EPDM, Viton, silicone or polyurethane for your site in Bektemir District. Short guide table below; full grades on the product page.

Minimum quantity depends on the product and material. Standard lead time is 3–5 business days; a new mold usually requires 10–14 days. We confirm the exact schedule after reviewing the drawing or sample.

Yes. Send drawing, photos or the worn part via WhatsApp — we quote lead time, material and price. For plants in Bektemir District, photos with a scale and operating medium description are usually enough.

If the part does not match the approved drawing in dimensions and material, we rework at our cost. Before a production run we agree tolerances and inspection method.

Manufacturing and warehouse are in Tashkent. Delivery to Bektemir in 1 day. After production we hand over to a carrier or arrange courier delivery.