REZINA.UZ
ELASTIK FORM
From idea to finished part.
Oil Seals
from 100 pcsStandard: 3–5 daysDelivery across Mirobod the day of the orderQuality guarantee

Custom Oil Seals in Mirobod District, Tashkent

We take orders for oil seals for plants in Mirobod District. Made to drawing, sample or dimensions at our Tashkent plant. Main materials: NBR, Viton / FKM, PTFE. Delivery across Mirobod the day of the order.

Materials
NBR (oil-resistant)Viton / FKMPTFESiliconePolyurethane
Applications
  • Gearboxes
  • Pumps
  • Compressors
  • Electric motors
  • Transmissions
Advantages
  • ✓Reinforced and frameless
  • ✓Operating up to +250°C (Viton)
  • ✓High sealing performance
  • ✓Import substitute
  • ✓From 100 pcs

For auto service in Mirobod, NBR is recommended for oil, EPDM for water and building heating, silicone for food outlets.

Delivery & production

Mirobod District · Delivery across Mirobod the day of the order

Manufactured in Tashkent. Delivery across Mirobod the day of the order. Packaging and handover time are agreed before dispatch.

Made at our own plant in Tashkent. Packaging and batch documents included.

Material selection by conditions

Short guide — full table on the product page

MediumTemperaturePressureMaterial
Engine oil, fuels−30…+120 °Cup to 0.5 barNBR + spring frame
Transmission oilup to +130 °Cup to 1 barNBR, FKM
Chemicals, steamup to +200 °Cup to 2 barViton / FKM, PTFE lip

Full material selection table →

FAQ

Delivery, materials and lead times for your order

Pick a topic or open any question

After production, we send the order to Mirobod District by courier or carrier. Delivery across Mirobod the day of the order. Handover time is confirmed with the order; packaging and documents are included.

Depends on medium (oil, water, steam, chemicals), temperature and pressure. Send drawing or sample via WhatsApp — our engineer will select NBR, EPDM, Viton, silicone or polyurethane for your site in Mirobod District. Short guide table below; full grades on the product page.

Minimum quantity depends on the product and material. Standard lead time is 3–5 business days; a new mold usually requires 10–14 days. We confirm the exact schedule after reviewing the drawing or sample.

Yes. Send drawing, photos or the worn part via WhatsApp — we quote lead time, material and price. For plants in Mirobod District, photos with a scale and operating medium description are usually enough.

If the part does not match the approved drawing in dimensions and material, we rework at our cost. Before a production run we agree tolerances and inspection method.

Manufacturing and warehouse are in Tashkent. Delivery across Mirobod the day of the order. After production we hand over to a carrier or arrange courier delivery.