REZINA.UZ
ELASTIK FORM LLC
From idea to finished part.
Oil Seals
from 100 pcsFrom 48 hoursDelivery to Yakkasaray in 1 dayQuality guarantee

Oil Seals for Yakkasaray District Enterprises

Urgent oil seals to Yakkasaray District: from 48 hours, Tashkent factory. NBR, Viton / FKM, PTFE. Delivery to Yakkasaray in 1 day. For food plants and warehouse complexes. Yakkasaray District is active in food and warehousing; for Oil Seals we match materials to Yakkasaray food plants and warehouses operating conditions.

Materials
NBR (oil-resistant)Viton / FKMPTFESiliconePolyurethane
Applications
  • Gearboxes
  • Pumps
  • Compressors
  • Electric motors
  • Transmissions
Advantages
  • Reinforced and frameless
  • Operating up to +250°C (Viton)
  • High sealing performance
  • Import substitute
  • From 100 pcs

Own factory in Tashkent — courier or carrier to Yakkasaray District. Reliable packaging, tracking.

Yakkasaray food plant pump and mixing equipment uses food-grade silicone and EPDM oil seals. Conveyor gearboxes — NBR with double dust lip.

Yakkasaray District is Tashkent's business center with banks, shopping centers and service enterprises. Auto services and repair shops order oil-resistant NBR seals for engines and hydraulic systems, plus gaskets for building plumbing systems.

Material selection by conditions

Guide by medium, temperature and pressure — exact quote after drawing

MediumTemperaturePressureMaterial
Engine oil, fuels−30…+120 °Cup to 0.5 barNBR + spring frame
Transmission oilup to +130 °Cup to 1 barNBR, FKM
Chemicals, steamup to +200 °Cup to 2 barViton / FKM, PTFE lip
High speed (up to 5000 RPM)up to +110 °Cup to 0.3 barNBR + PTFE

FAQ

Delivery, materials and lead times for your order

Pick a topic or open any question

Our factory is in Tashkent — we deliver to Yakkasaray District same day or next morning by courier or carrier. Delivery to Yakkasaray in 1 day. Packaging and documents for every batch.

Depends on medium (oil, water, steam, chemicals), temperature and pressure. Send drawing or sample via Telegram — our engineer will select NBR, EPDM, Viton, silicone or polyurethane for your site in Yakkasaray District. See the selection table below.

From 100 pcs (or one batch for custom shapes). Lead time from 48 hours after drawing and material approval. For urgent orders to Yakkasaray District, ask when ordering — we often accelerate using existing molds.

HomeCatalog
BlogOrderContacts