REZINA.UZ
ELASTIK FORM
From idea to finished part.
Oil Seals
from 100 pcsStandard: 3–5 daysDelivery to Yashnabad in 1 dayQuality guarantee

Custom Oil Seals in Yashnabad District, Tashkent

We manufacture oil seals by drawing, sample or customer dimensions at our Tashkent production site. Main materials: NBR, Viton / FKM, PTFE. Delivery to Yashnabad in 1 day. We work with food enterprises and repair workshops. Yashnabad District is active in food and repair; for Oil Seals we match materials to Yashnabad food enterprises and repair shops operating conditions.

Materials
NBR (oil-resistant)Viton / FKMPTFESiliconePolyurethane
Applications
  • Gearboxes
  • Pumps
  • Compressors
  • Electric motors
  • Transmissions
Advantages
  • Reinforced and frameless
  • Operating up to +250°C (Viton)
  • High sealing performance
  • Import substitute
  • From 100 pcs

Yashnabad food shop equipment and repair shops use NBR oil seals for industrial pumps and food-grade EPDM/silicone for product media pumps.

Yashnabad is one of Tashkent's oldest industrial districts. Large textile mills order vibration-isolating bushings, food plants order silicone seals, construction bases order hydraulic cuffs and gaskets for construction equipment. We supply in batches under contract.

Delivery & production

Yashnabad District · Delivery to Yashnabad in 1 day

Manufactured in Tashkent. Delivery to Yashnabad in 1 day. Packaging and handover time are agreed before dispatch.

Made at our own plant in Tashkent. Packaging and batch documents included.

Material selection by conditions

Short guide — full table on the product page

MediumTemperaturePressureMaterial
Engine oil, fuels−30…+120 °Cup to 0.5 barNBR + spring frame
Transmission oilup to +130 °Cup to 1 barNBR, FKM
Chemicals, steamup to +200 °Cup to 2 barViton / FKM, PTFE lip

Full material selection table →

FAQ

Delivery, materials and lead times for your order

Pick a topic or open any question

After production, we send the order to Yashnabad District by courier or carrier. Delivery to Yashnabad in 1 day. Handover time is confirmed with the order; packaging and documents are included.

Depends on medium (oil, water, steam, chemicals), temperature and pressure. Send drawing or sample via WhatsApp — our engineer will select NBR, EPDM, Viton, silicone or polyurethane for your site in Yashnabad District. Short guide table below; full grades on the product page.

Minimum quantity depends on the product and material. Standard lead time is 3–5 business days; a new mold usually requires 10–14 days. We confirm the exact schedule after reviewing the drawing or sample.

Yes. Send drawing, photos or the worn part via WhatsApp — we quote lead time, material and price. For plants in Yashnabad District, photos with a scale and operating medium description are usually enough.

If the part does not match the approved drawing in dimensions and material, we rework at our cost. Before a production run we agree tolerances and inspection method.

Manufacturing and warehouse are in Tashkent. Delivery to Yashnabad in 1 day. After production we hand over to a carrier or arrange courier delivery.