REZINA.UZ
ELASTIK FORM
From idea to finished part.
Silicone Rubber Products
from 100 pcsStandard: 3–5 daysDelivery to Fergana in 1-2 daysQuality guarantee

Custom Silicone Parts in Fergana

We manufacture silicone parts by drawing, sample or customer dimensions at our Tashkent production site. Main materials: Food-grade silicone, Heat-resistant silicone, Medical silicone. Delivery to Fergana in 1-2 days. We work with Fergana region production facilities. Fergana is strong in petrochemicals and chemicals — for Silicone Parts we match rubber grades to actual operating conditions at regional sites.

Materials
Food-grade siliconeHeat-resistant siliconeMedical siliconeMVQColored silicone
Applications
  • Food industry
  • Pharmaceuticals
  • Medical equipment
  • High-temperature processes
  • Electronics
Advantages
  • ✓Temperature -60°C to +250°C
  • ✓Food-grade certified
  • ✓Non-toxic material
  • ✓UV and ozone resistant
  • ✓Any shape by drawing

Fergana chemical and petrochemical plants use FVMQ fluorosilicone products for aggressive solvents and petroleum products at up to +230°C.

Fergana region is Uzbekistan's chemical industry center. The Fergana refinery and Fergana-Azot have strict requirements for seal chemical resistance. We select materials (Viton, FKM, PTFE) for aggressive media at temperatures up to +250°C, ensuring long part service life.

Delivery & production

Fergana · Delivery to Fergana in 1-2 days

Manufactured in Tashkent. Delivery to Fergana in 1-2 days. Packaging and shipping method are agreed before dispatch.

Made at our own plant in Tashkent. Packaging and batch documents included.

Material selection by conditions

Short guide — full table on the product page

MediumTemperaturePressureMaterial
Food industry−60…+230 °Cup to 5 barVMQ silicone (food-grade)
Medical, pharma−50…+200 °Cup to 3 barMedical silicone
High temperatureup to +250 °Cup to 10 barFVMQ fluorosilicone

Full material selection table →

FAQ

Delivery, materials and lead times for your order

Pick a topic or open any question

We manufacture in Tashkent and ship to Fergana by transport company. Delivery to Fergana in 1-2 days. Double packaging and cargo tracking.

Depends on medium (oil, water, steam, chemicals), temperature and pressure. Send drawing or sample via WhatsApp — our engineer will select NBR, EPDM, Viton, silicone or polyurethane for your site in Fergana. Short guide table below; full grades on the product page.

Minimum quantity depends on the product and material. Standard lead time is 3–5 business days; a new mold usually requires 10–14 days. We confirm the exact schedule after reviewing the drawing or sample.

Yes. Send drawing, photos or the worn part via WhatsApp — we quote lead time, material and price. For plants in Fergana, photos with a scale and operating medium description are usually enough.

If the part does not match the approved drawing in dimensions and material, we rework at our cost. Before a production run we agree tolerances and inspection method.

Manufacturing and warehouse are in Tashkent. Delivery to Fergana in 1-2 days. After production we hand over to a carrier or arrange courier delivery.