REZINA.UZ
ELASTIK FORM
From idea to finished part.
Silicone Rubber Products
from 100 pcsStandard: 3–5 daysDelivery to Almazar in 1 dayQuality guarantee

Custom Silicone Parts in Almazar District, Tashkent

We manufacture silicone parts by drawing, sample or customer dimensions at our Tashkent production site. Main materials: Food-grade silicone, Heat-resistant silicone, Medical silicone. Delivery to Almazar in 1 day. We work with textile mills and production bases. Almazar District is active in textile mills; for Silicone Parts we match materials to Almazar textile mills and production bases operating conditions.

Materials
Food-grade siliconeHeat-resistant siliconeMedical siliconeMVQColored silicone
Applications
  • Food industry
  • Pharmaceuticals
  • Medical equipment
  • High-temperature processes
  • Electronics
Advantages
  • Temperature -60°C to +250°C
  • Food-grade certified
  • Non-toxic material
  • UV and ozone resistant
  • Any shape by drawing

Almazar textile mills use silicone seals for high-temperature fabric finishing equipment (+150…+200°C). Dyeing machines — silicone resistant to aniline dyes.

Almazar District is Tashkent's heavy industry and construction center. Construction companies order hydraulic seals for special equipment, transport bases order oil seals and cuffs for trucks, factories order rings and gaskets for process equipment.

Delivery & production

Almazar District · Delivery to Almazar in 1 day

Manufactured in Tashkent. Delivery to Almazar in 1 day. Packaging and handover time are agreed before dispatch.

Made at our own plant in Tashkent. Packaging and batch documents included.

Material selection by conditions

Short guide — full table on the product page

MediumTemperaturePressureMaterial
Food industry−60…+230 °Cup to 5 barVMQ silicone (food-grade)
Medical, pharma−50…+200 °Cup to 3 barMedical silicone
High temperatureup to +250 °Cup to 10 barFVMQ fluorosilicone

Full material selection table →

FAQ

Delivery, materials and lead times for your order

Pick a topic or open any question

After production, we send the order to Almazar District by courier or carrier. Delivery to Almazar in 1 day. Handover time is confirmed with the order; packaging and documents are included.

Depends on medium (oil, water, steam, chemicals), temperature and pressure. Send drawing or sample via WhatsApp — our engineer will select NBR, EPDM, Viton, silicone or polyurethane for your site in Almazar District. Short guide table below; full grades on the product page.

Minimum quantity depends on the product and material. Standard lead time is 3–5 business days; a new mold usually requires 10–14 days. We confirm the exact schedule after reviewing the drawing or sample.

Yes. Send drawing, photos or the worn part via WhatsApp — we quote lead time, material and price. For plants in Almazar District, photos with a scale and operating medium description are usually enough.

If the part does not match the approved drawing in dimensions and material, we rework at our cost. Before a production run we agree tolerances and inspection method.

Manufacturing and warehouse are in Tashkent. Delivery to Almazar in 1 day. After production we hand over to a carrier or arrange courier delivery.