REZINA.UZ
ELASTIK FORM LLC
From idea to finished part.
Technical Plates
from 100 kgFrom 48 hoursDelivery to Andijan in 1-2 daysQuality guarantee

Technical Plates in Andijan — Production & Delivery

Direct-from-manufacturer technical plates supply to Andijan. Any volume from 100 pcs, materials: Oil-resistant, Chemical-resistant, Food-grade. Full cycle: measurement → mold → series. Delivery to Andijan in 1-2 days. Andijan is strong in automotive and electrical — for Technical Plates we match rubber grades to actual operating conditions at regional sites.

Materials
Oil-resistantChemical-resistantFood-gradeDielectricFrost-resistant
Applications
  • Gasket material
  • Vibration isolation
  • Lining
  • Joint sealing
  • Flooring and coatings
Advantages
  • Thickness from 2 to 50 mm
  • Cut to customer dimensions
  • In-stock options
  • Food-grade and dielectric grades
  • Sheet and roll supply

Andijan assembly conveyor and press shops use rubber technical plates for surface protective coatings and anti-vibration pads under molds.

Andijan region is Uzbekistan's machine-building center. UzAuto Motors, Andijankabel electrical plant and oil processing create steady demand for automotive seals, cable bushings and food-grade gaskets. We've worked with valley enterprises for over 3 years and understand each industry's requirements.

Delivery & production

Andijan · Delivery to Andijan in 1-2 days

Own factory in Tashkent. Delivery to Andijan in 1-2 days. Reliable packaging, cargo tracking.

Made at our own plant in Tashkent. Packaging and batch documents included.

Material selection by conditions

Short guide — full table on the product page

MediumTemperaturePressureMaterial
Gasket layer−30…+100 °Cup to 10 barMBS, TMKSH
Vibration isolation−40…+70 °Cno pressureSBR, EPDM
Drum liningup to +80 °Cup to 5 barNR, polyurethane

Full material selection table →

FAQ

Delivery, materials and lead times for your order

Pick a topic or open any question

We manufacture in Tashkent and ship to Andijan by transport company. Delivery to Andijan in 1-2 days. Double packaging and cargo tracking.

Depends on medium (oil, water, steam, chemicals), temperature and pressure. Send drawing or sample via WhatsApp — our engineer will select NBR, EPDM, Viton, silicone or polyurethane for your site in Andijan. Short guide table below; full grades on the product page.

From 100 pcs (or one batch for custom shapes). Lead time from 48 hours after drawing and material approval. For urgent orders to Andijan, ask when ordering — we often accelerate using existing molds.

Yes. Send drawing, photos or the worn part via WhatsApp — we quote lead time, material and price. For plants in Andijan, photos with a scale and operating medium description are usually enough.

If the part does not match the approved drawing in dimensions and material, we rework at our cost. Before a production run we agree tolerances and inspection method.

Manufacturing and warehouse are in Tashkent. Delivery to Andijan in 1-2 days. After production we hand over to a carrier or arrange courier delivery.

HomeCatalog
BlogOrderContacts