REZINA.UZ
ELASTIK FORM
From idea to finished part.
Technical Plates
from 100 kgStandard: 3–5 daysDelivery to Namangan in 1-2 daysQuality guarantee

Custom Technical Rubber Sheets in Namangan

We manufacture technical rubber sheets by drawing, sample or customer dimensions at our Tashkent production site. Main materials: Oil-resistant, Chemical-resistant, Food-grade. Delivery to Namangan in 1-2 days. We work with Namangan region enterprises. Namangan is strong in textile, leather and food — for Technical Rubber Sheets we match rubber grades to actual operating conditions at regional sites.

Materials
Oil-resistantChemical-resistantFood-gradeDielectricFrost-resistant
Applications
  • Gasket material
  • Vibration isolation
  • Lining
  • Joint sealing
  • Flooring and coatings
Advantages
  • Thickness from 2 to 50 mm
  • Cut to customer dimensions
  • In-stock options
  • Food-grade and dielectric grades
  • Sheet and roll supply

Namangan textile machines and dyeing units are mounted on rubber technical plates for vibration isolation. EPDM sheets as acid-resistant substrate on dyeing racks.

Namangan region specializes in light industry and agricultural processing. Silk mills need vibration-isolating bushings for looms, canning factories require food-grade silicone seals, and leather plants order chemical-resistant gaskets from EPDM and Viton. We select the optimal material for each application.

Delivery & production

Namangan · Delivery to Namangan in 1-2 days

Manufactured in Tashkent. Delivery to Namangan in 1-2 days. Packaging and shipping method are agreed before dispatch.

Made at our own plant in Tashkent. Packaging and batch documents included.

Material selection by conditions

Short guide — full table on the product page

MediumTemperaturePressureMaterial
Gasket layer−30…+100 °Cup to 10 barMBS, TMKSH
Vibration isolation−40…+70 °Cno pressureSBR, EPDM
Drum liningup to +80 °Cup to 5 barNR, polyurethane

Full material selection table →

FAQ

Delivery, materials and lead times for your order

Pick a topic or open any question

We manufacture in Tashkent and ship to Namangan by transport company. Delivery to Namangan in 1-2 days. Double packaging and cargo tracking.

Depends on medium (oil, water, steam, chemicals), temperature and pressure. Send drawing or sample via WhatsApp — our engineer will select NBR, EPDM, Viton, silicone or polyurethane for your site in Namangan. Short guide table below; full grades on the product page.

Minimum quantity depends on the product and material. Standard lead time is 3–5 business days; a new mold usually requires 10–14 days. We confirm the exact schedule after reviewing the drawing or sample.

Yes. Send drawing, photos or the worn part via WhatsApp — we quote lead time, material and price. For plants in Namangan, photos with a scale and operating medium description are usually enough.

If the part does not match the approved drawing in dimensions and material, we rework at our cost. Before a production run we agree tolerances and inspection method.

Manufacturing and warehouse are in Tashkent. Delivery to Namangan in 1-2 days. After production we hand over to a carrier or arrange courier delivery.