REZINA.UZ
ELASTIK FORM
From idea to finished part.
Technical Plates
from 100 kgStandard: 3–5 daysDelivery to Sergeli in 1 dayQuality guarantee

Custom Technical Rubber Sheets in Sergeli District, Tashkent

We manufacture technical rubber sheets by drawing, sample or customer dimensions at our Tashkent production site. Main materials: Oil-resistant, Chemical-resistant, Food-grade. Delivery to Sergeli in 1 day. We work with construction companies and utilities. Sergeli District is active in construction and utilities; for Technical Rubber Sheets we match materials to Sergeli construction and utility services operating conditions.

Materials
Oil-resistantChemical-resistantFood-gradeDielectricFrost-resistant
Applications
  • Gasket material
  • Vibration isolation
  • Lining
  • Joint sealing
  • Flooring and coatings
Advantages
  • ✓Thickness from 2 to 50 mm
  • ✓Cut to customer dimensions
  • ✓In-stock options
  • ✓Food-grade and dielectric grades
  • ✓Sheet and roll supply

Sergeli construction industry uses EPDM technical plates as waterproofing substrates under foundations and deformation joints. MBS for anti-vibration pads under pump units.

Sergeli District is booming: new residential complexes are built, utilities are laid, manufacturing opens. Water supply pump stations, construction companies and utilities create steady demand for EPDM seals for water systems, cuffs for construction equipment and plumbing gaskets.

Delivery & production

Sergeli District · Delivery to Sergeli in 1 day

Manufactured in Tashkent. Delivery to Sergeli in 1 day. Packaging and handover time are agreed before dispatch.

Made at our own plant in Tashkent. Packaging and batch documents included.

Material selection by conditions

Short guide — full table on the product page

MediumTemperaturePressureMaterial
Gasket layer−30…+100 °Cup to 10 barMBS, TMKSH
Vibration isolation−40…+70 °Cno pressureSBR, EPDM
Drum liningup to +80 °Cup to 5 barNR, polyurethane

Full material selection table →

FAQ

Delivery, materials and lead times for your order

Pick a topic or open any question

After production, we send the order to Sergeli District by courier or carrier. Delivery to Sergeli in 1 day. Handover time is confirmed with the order; packaging and documents are included.

Depends on medium (oil, water, steam, chemicals), temperature and pressure. Send drawing or sample via WhatsApp — our engineer will select NBR, EPDM, Viton, silicone or polyurethane for your site in Sergeli District. Short guide table below; full grades on the product page.

Minimum quantity depends on the product and material. Standard lead time is 3–5 business days; a new mold usually requires 10–14 days. We confirm the exact schedule after reviewing the drawing or sample.

Yes. Send drawing, photos or the worn part via WhatsApp — we quote lead time, material and price. For plants in Sergeli District, photos with a scale and operating medium description are usually enough.

If the part does not match the approved drawing in dimensions and material, we rework at our cost. Before a production run we agree tolerances and inspection method.

Manufacturing and warehouse are in Tashkent. Delivery to Sergeli in 1 day. After production we hand over to a carrier or arrange courier delivery.