REZINA.UZ
ELASTIK FORM
From idea to finished part.
Technical Plates
from 100 kgStandard: 3–5 daysDelivery to Shaykhantohur in 1 dayQuality guarantee

Custom Technical Rubber Sheets in Shaykhantohur District, Tashkent

We manufacture technical rubber sheets by drawing, sample or customer dimensions at our Tashkent production site. Main materials: Oil-resistant, Chemical-resistant, Food-grade. Delivery to Shaykhantohur in 1 day. We work with industrial enterprises and maintenance services. Shaykhantohur District is active in industry and services; for Technical Rubber Sheets we match materials to Shaykhantohur industrial and service enterprises operating conditions.

Materials
Oil-resistantChemical-resistantFood-gradeDielectricFrost-resistant
Applications
  • Gasket material
  • Vibration isolation
  • Lining
  • Joint sealing
  • Flooring and coatings
Advantages
  • ✓Thickness from 2 to 50 mm
  • ✓Cut to customer dimensions
  • ✓In-stock options
  • ✓Food-grade and dielectric grades
  • ✓Sheet and roll supply

Shaykhantohur enterprise boiler and industrial equipment uses MBS technical plates for vibration isolation. Pipeline gasket material — EPDM and rubber-coated paronite.

Shaykhantohur is Tashkent's oldest administrative district. The dense water supply, sewage and heating networks require constant replacement of valve seals, pump cuffs and flange gaskets. District utility companies are our regular partners.

Delivery & production

Shaykhantohur District · Delivery to Shaykhantohur in 1 day

Manufactured in Tashkent. Delivery to Shaykhantohur in 1 day. Packaging and handover time are agreed before dispatch.

Made at our own plant in Tashkent. Packaging and batch documents included.

Material selection by conditions

Short guide — full table on the product page

MediumTemperaturePressureMaterial
Gasket layer−30…+100 °Cup to 10 barMBS, TMKSH
Vibration isolation−40…+70 °Cno pressureSBR, EPDM
Drum liningup to +80 °Cup to 5 barNR, polyurethane

Full material selection table →

FAQ

Delivery, materials and lead times for your order

Pick a topic or open any question

After production, we send the order to Shaykhantohur District by courier or carrier. Delivery to Shaykhantohur in 1 day. Handover time is confirmed with the order; packaging and documents are included.

Depends on medium (oil, water, steam, chemicals), temperature and pressure. Send drawing or sample via WhatsApp — our engineer will select NBR, EPDM, Viton, silicone or polyurethane for your site in Shaykhantohur District. Short guide table below; full grades on the product page.

Minimum quantity depends on the product and material. Standard lead time is 3–5 business days; a new mold usually requires 10–14 days. We confirm the exact schedule after reviewing the drawing or sample.

Yes. Send drawing, photos or the worn part via WhatsApp — we quote lead time, material and price. For plants in Shaykhantohur District, photos with a scale and operating medium description are usually enough.

If the part does not match the approved drawing in dimensions and material, we rework at our cost. Before a production run we agree tolerances and inspection method.

Manufacturing and warehouse are in Tashkent. Delivery to Shaykhantohur in 1 day. After production we hand over to a carrier or arrange courier delivery.