
Technical Plates in Tashkent — Urgent production from 48 hours
Urgent technical plates order to Tashkent: production from 48 hours after drawing approval. Materials: Oil-resistant, Chemical-resistant, Food-grade, made in Tashkent. Delivery in Tashkent in 1 day. We work with Tashkent. Tashkent is strong in machine-building, food and construction — for Technical Plates we match rubber grades to actual operating conditions at regional sites.
- Gasket material
- Vibration isolation
- Lining
- Joint sealing
- Flooring and coatings
- ✓Thickness from 2 to 50 mm
- ✓Cut to customer dimensions
- ✓In-stock options
- ✓Food-grade and dielectric grades
- ✓Sheet and roll supply