REZINA.UZ
ELASTIK FORM
From idea to finished part.
Sealing Products
from 100 mStandard: 3–5 daysDelivery to Andijan in 1-2 daysQuality guarantee

Custom Sealing Products in Andijan

We manufacture sealing products by drawing, sample or customer dimensions at our Tashkent production site. Main materials: EPDM, Silicone, NBR. Delivery to Andijan in 1-2 days. We work with Fergana Valley industrial enterprises. Andijan is strong in automotive and electrical — for Sealing Products we match rubber grades to actual operating conditions at regional sites.

Materials
EPDMSiliconeNBRPVCThermoplastic
Applications
  • Window and door systems
  • Hatches and covers
  • Process equipment
  • Automotive industry
  • Refrigeration equipment
Advantages
  • ✓Any profile by drawing
  • ✓Extrusion and molding
  • ✓Heat and frost resistant
  • ✓Continuous and closed-loop
  • ✓By meter and contour

Andijan enterprise production buildings and warehouse gates use EPDM seals. High UV resistance and maintained elasticity across Fergana Valley summer-to-winter temperature range.

Andijan region is Uzbekistan's machine-building center. UzAuto Motors, Andijankabel electrical plant and oil processing create steady demand for automotive seals, cable bushings and food-grade gaskets. We've worked with valley enterprises for over 3 years and understand each industry's requirements.

Delivery & production

Andijan · Delivery to Andijan in 1-2 days

Manufactured in Tashkent. Delivery to Andijan in 1-2 days. Packaging and shipping method are agreed before dispatch.

Made at our own plant in Tashkent. Packaging and batch documents included.

Material selection by conditions

Short guide — full table on the product page

MediumTemperaturePressureMaterial
Gates, doors, facades−40…+80 °Cno pressureEPDM, silicone
Refrigeration−60…+40 °Cno pressureEPDM, NBR
Outdoor, UV−30…+70 °Cno pressureEPDM (anti-UV)

Full material selection table →

FAQ

Delivery, materials and lead times for your order

Pick a topic or open any question

We manufacture in Tashkent and ship to Andijan by transport company. Delivery to Andijan in 1-2 days. Double packaging and cargo tracking.

Depends on medium (oil, water, steam, chemicals), temperature and pressure. Send drawing or sample via WhatsApp — our engineer will select NBR, EPDM, Viton, silicone or polyurethane for your site in Andijan. Short guide table below; full grades on the product page.

Minimum quantity depends on the product and material. Standard lead time is 3–5 business days; a new mold usually requires 10–14 days. We confirm the exact schedule after reviewing the drawing or sample.

Yes. Send drawing, photos or the worn part via WhatsApp — we quote lead time, material and price. For plants in Andijan, photos with a scale and operating medium description are usually enough.

If the part does not match the approved drawing in dimensions and material, we rework at our cost. Before a production run we agree tolerances and inspection method.

Manufacturing and warehouse are in Tashkent. Delivery to Andijan in 1-2 days. After production we hand over to a carrier or arrange courier delivery.