REZINA.UZ
ELASTIK FORM
From idea to finished part.
Sealing Products
from 100 mStandard: 3–5 daysDelivery to Mirzo-Ulugbek in 1 dayQuality guarantee

Custom Sealing Products in Mirzo-Ulugbek District, Tashkent

We manufacture sealing products by drawing, sample or customer dimensions at our Tashkent production site. Main materials: EPDM, Silicone, NBR. Delivery to Mirzo-Ulugbek in 1 day. We work with machine-building and chemical enterprises. Mirzo-Ulugbek District is active in machine-building and chemicals; for Sealing Products we match materials to Mirzo-Ulugbek machine-building and chemical plants operating conditions.

Materials
EPDMSiliconeNBRPVCThermoplastic
Applications
  • Window and door systems
  • Hatches and covers
  • Process equipment
  • Automotive industry
  • Refrigeration equipment
Advantages
  • ✓Any profile by drawing
  • ✓Extrusion and molding
  • ✓Heat and frost resistant
  • ✓Continuous and closed-loop
  • ✓By meter and contour

Mirzo-Ulugbek machine-building plant production buildings need NBR seals for oil-environment technical gates and EPDM for standard gates and windows.

Mirzo-Ulugbek District has historically specialized in machine-building and chemical industry. Major district factories regularly order sealing rings for reactors, hydraulic cylinder cuffs and chemical-resistant Viton and PTFE gaskets. We know the technical requirements of district industrial enterprises and select materials considering the working medium.

Delivery & production

Mirzo-Ulugbek District · Delivery to Mirzo-Ulugbek in 1 day

Manufactured in Tashkent. Delivery to Mirzo-Ulugbek in 1 day. Packaging and handover time are agreed before dispatch.

Made at our own plant in Tashkent. Packaging and batch documents included.

Material selection by conditions

Short guide — full table on the product page

MediumTemperaturePressureMaterial
Gates, doors, facades−40…+80 °Cno pressureEPDM, silicone
Refrigeration−60…+40 °Cno pressureEPDM, NBR
Outdoor, UV−30…+70 °Cno pressureEPDM (anti-UV)

Full material selection table →

FAQ

Delivery, materials and lead times for your order

Pick a topic or open any question

After production, we send the order to Mirzo-Ulugbek District by courier or carrier. Delivery to Mirzo-Ulugbek in 1 day. Handover time is confirmed with the order; packaging and documents are included.

Depends on medium (oil, water, steam, chemicals), temperature and pressure. Send drawing or sample via WhatsApp — our engineer will select NBR, EPDM, Viton, silicone or polyurethane for your site in Mirzo-Ulugbek District. Short guide table below; full grades on the product page.

Minimum quantity depends on the product and material. Standard lead time is 3–5 business days; a new mold usually requires 10–14 days. We confirm the exact schedule after reviewing the drawing or sample.

Yes. Send drawing, photos or the worn part via WhatsApp — we quote lead time, material and price. For plants in Mirzo-Ulugbek District, photos with a scale and operating medium description are usually enough.

If the part does not match the approved drawing in dimensions and material, we rework at our cost. Before a production run we agree tolerances and inspection method.

Manufacturing and warehouse are in Tashkent. Delivery to Mirzo-Ulugbek in 1 day. After production we hand over to a carrier or arrange courier delivery.