REZINA.UZ
ELASTIK FORM
From idea to finished part.
Sealing Products
from 100 mStandard: 3–5 daysDelivery to Urgut in 1–2 daysQuality guarantee

Custom Sealing Products in Urgut

We take orders for sealing products for plants in Urgut. Made to drawing, sample or dimensions at our Tashkent plant. Main materials: EPDM, Silicone, NBR. Delivery to Urgut in 1–2 days.

Materials
EPDMSiliconeNBRPVCThermoplastic
Applications
  • Window and door systems
  • Hatches and covers
  • Process equipment
  • Automotive industry
  • Refrigeration equipment
Advantages
  • ✓Any profile by drawing
  • ✓Extrusion and molding
  • ✓Heat and frost resistant
  • ✓Continuous and closed-loop
  • ✓By meter and contour

For workshops and farm machinery in Urgut, NBR is recommended for oil, EPDM for water, silicone for food contact. Orders are usually small: a seal, a cuff, a bushing or a gasket. A sample and the medium are enough.

Delivery & production

Urgut · Delivery to Urgut in 1–2 days

Manufactured in Tashkent. Delivery to Urgut in 1–2 days. Packaging and shipping method are agreed before dispatch.

Made at our own plant in Tashkent. Packaging and batch documents included.

Material selection by conditions

Short guide — full table on the product page

MediumTemperaturePressureMaterial
Gates, doors, facades−40…+80 °Cno pressureEPDM, silicone
Refrigeration−60…+40 °Cno pressureEPDM, NBR
Outdoor, UV−30…+70 °Cno pressureEPDM (anti-UV)

Full material selection table →

FAQ

Delivery, materials and lead times for your order

Pick a topic or open any question

We manufacture in Tashkent and ship to Urgut by transport company. Delivery to Urgut in 1–2 days. Double packaging and cargo tracking.

Depends on medium (oil, water, steam, chemicals), temperature and pressure. Send drawing or sample via WhatsApp — our engineer will select NBR, EPDM, Viton, silicone or polyurethane for your site in Urgut. Short guide table below; full grades on the product page.

Minimum quantity depends on the product and material. Standard lead time is 3–5 business days; a new mold usually requires 10–14 days. We confirm the exact schedule after reviewing the drawing or sample.

Yes. Send drawing, photos or the worn part via WhatsApp — we quote lead time, material and price. For plants in Urgut, photos with a scale and operating medium description are usually enough.

If the part does not match the approved drawing in dimensions and material, we rework at our cost. Before a production run we agree tolerances and inspection method.

Manufacturing and warehouse are in Tashkent. Delivery to Urgut in 1–2 days. After production we hand over to a carrier or arrange courier delivery.