REZINA.UZ
ELASTIK FORM
From idea to finished part.
Sealing Rings
from 100 pcsStandard: 3–5 daysDelivery to Mubarek in 1–2 daysQuality guarantee

Custom Sealing Rings in Mubarek

We take orders for sealing rings for plants in Mubarek. Made to drawing, sample or dimensions at our Tashkent plant. Main materials: NBR, EPDM, Viton / FKM. Delivery to Mubarek in 1–2 days.

Materials
NBR (oil-resistant)EPDM (heat-resistant)Viton / FKM (chemical-resistant)Silicone (food-grade / heat-resistant)Polyurethane
Applications
  • Hydraulic systems
  • Pneumatic equipment
  • Pumps and compressors
  • Pipeline fittings
  • Automotive industry
Advantages
  • ✓Exact dimensional compliance
  • ✓Production from 100 pcs
  • ✓Material selection for working environment
  • ✓Standard lead time 3–5 business days
  • ✓Rework guarantee at our expense

For Mubarek gas processing, FKM is recommended for gas, condensate and temperatures up to +200 °C, PTFE where the medium is too hard for rubber. NBR for compressor hydraulic oil: that grade is not rated for hydrogen sulphide.

Delivery & production

Mubarek · Delivery to Mubarek in 1–2 days

Manufactured in Tashkent. Delivery to Mubarek in 1–2 days. Packaging and shipping method are agreed before dispatch.

Made at our own plant in Tashkent. Packaging and batch documents included.

Material selection by conditions

Short guide — full table on the product page

MediumTemperaturePressureMaterial
Oil, diesel, fuels−30…+120 °Cup to 25 barNBR, HNBR
Steam, hot waterup to +150 °Cup to 16 barEPDM
Acids, alkalis, solventsup to +200 °Cup to 40 barViton / FKM

Full material selection table →

FAQ

Delivery, materials and lead times for your order

Pick a topic or open any question

We manufacture in Tashkent and ship to Mubarek by transport company. Delivery to Mubarek in 1–2 days. Double packaging and cargo tracking.

Depends on medium (oil, water, steam, chemicals), temperature and pressure. Send drawing or sample via WhatsApp — our engineer will select NBR, EPDM, Viton, silicone or polyurethane for your site in Mubarek. Short guide table below; full grades on the product page.

Minimum quantity depends on the product and material. Standard lead time is 3–5 business days; a new mold usually requires 10–14 days. We confirm the exact schedule after reviewing the drawing or sample.

Yes. Send drawing, photos or the worn part via WhatsApp — we quote lead time, material and price. For plants in Mubarek, photos with a scale and operating medium description are usually enough.

If the part does not match the approved drawing in dimensions and material, we rework at our cost. Before a production run we agree tolerances and inspection method.

Manufacturing and warehouse are in Tashkent. Delivery to Mubarek in 1–2 days. After production we hand over to a carrier or arrange courier delivery.