REZINA.UZ
ELASTIK FORM LLC
From idea to finished part.
Sealing Rings
from 100 pcsFrom 48 hoursDelivery to Almazar in 1 dayQuality guarantee

Sealing Rings in Almazar District — Urgent from 48h

We manufacture sealing rings and deliver to Almazar District. Own factory in Tashkent — by drawing, sample or custom dimensions from NBR, EPDM, Viton / FKM. Delivery to Almazar in 1 day. Working with textile mills and production bases. Almazar District is active in textile mills; for Sealing Rings we match materials to Almazar textile mills and production bases operating conditions.

Materials
NBR (oil-resistant)EPDM (heat-resistant)Viton / FKM (chemical-resistant)Silicone (food-grade / heat-resistant)Polyurethane
Applications
  • Hydraulic systems
  • Pneumatic equipment
  • Pumps and compressors
  • Pipeline fittings
  • Automotive industry
Advantages
  • Exact dimensional compliance
  • Production from 100 pcs
  • Material selection for working environment
  • Production start from 48 hours
  • Rework guarantee at our expense

Almazar textile mills use EPDM rings for steam systems and dyeing machines. NBR for hydraulic presses and material handling equipment in warehouse areas.

Almazar District is Tashkent's heavy industry and construction center. Construction companies order hydraulic seals for special equipment, transport bases order oil seals and cuffs for trucks, factories order rings and gaskets for process equipment.

Delivery & production

Almazar District · Delivery to Almazar in 1 day

Own factory in Tashkent — courier or carrier to Almazar District. Reliable packaging, tracking.

Made at our own plant in Tashkent. Packaging and batch documents included.

Material selection by conditions

Short guide — full table on the product page

MediumTemperaturePressureMaterial
Oil, diesel, fuels−30…+120 °Cup to 25 barNBR, HNBR
Steam, hot waterup to +150 °Cup to 16 barEPDM
Acids, alkalis, solventsup to +200 °Cup to 40 barViton / FKM

Full material selection table →

FAQ

Delivery, materials and lead times for your order

Pick a topic or open any question

Our factory is in Tashkent — we deliver to Almazar District same day or next morning by courier or carrier. Delivery to Almazar in 1 day. Packaging and documents for every batch.

Depends on medium (oil, water, steam, chemicals), temperature and pressure. Send drawing or sample via WhatsApp — our engineer will select NBR, EPDM, Viton, silicone or polyurethane for your site in Almazar District. Short guide table below; full grades on the product page.

From 100 pcs (or one batch for custom shapes). Lead time from 48 hours after drawing and material approval. For urgent orders to Almazar District, ask when ordering — we often accelerate using existing molds.

Yes. Send drawing, photos or the worn part via WhatsApp — we quote lead time, material and price. For plants in Almazar District, photos with a scale and operating medium description are usually enough.

If the part does not match the approved drawing in dimensions and material, we rework at our cost. Before a production run we agree tolerances and inspection method.

Manufacturing and warehouse are in Tashkent. Delivery to Almazar in 1 day. After production we hand over to a carrier or arrange courier delivery.

HomeCatalog
BlogOrderContacts