REZINA.UZ
ELASTIK FORM LLC
From idea to finished part.
Sealing Rings
from 100 pcsFrom 48 hoursDelivery to Chilanzar in 1 dayQuality guarantee

Sealing Rings factory for Chilanzar District

Urgent sealing rings to Chilanzar District: from 48 hours, Tashkent factory. NBR, EPDM, Viton / FKM. Delivery to Chilanzar in 1 day. For machine shops and auto repair facilities. Chilanzar District is active in auto repair and machine shops; for Sealing Rings we match materials to Chilanzar auto repair and machine shops operating conditions.

Materials
NBR (oil-resistant)EPDM (heat-resistant)Viton / FKM (chemical-resistant)Silicone (food-grade / heat-resistant)Polyurethane
Applications
  • Hydraulic systems
  • Pneumatic equipment
  • Pumps and compressors
  • Pipeline fittings
  • Automotive industry
Advantages
  • Exact dimensional compliance
  • Production from 100 pcs
  • Material selection for working environment
  • Production start from 48 hours
  • Rework guarantee at our expense

Own factory in Tashkent — courier or carrier to Chilanzar District. Reliable packaging, tracking.

Chilanzar auto repair and machine shops regularly order NBR rings for power steering, gearboxes and brake systems. Standard sizes in stock, non-standard from 48 hours.

Chilanzar is one of Tashkent's most populous districts. Machine shops, auto repair facilities, food production plants are located here. Regular rubber product customers include repair bases, industrial pump stations and water supply facilities.

Material selection by conditions

Guide by medium, temperature and pressure — exact quote after drawing

MediumTemperaturePressureMaterial
Oil, diesel, fuels−30…+120 °Cup to 25 barNBR, HNBR
Steam, hot waterup to +150 °Cup to 16 barEPDM
Acids, alkalis, solventsup to +200 °Cup to 40 barViton / FKM
Food media, CIP cleaning−40…+180 °Cup to 10 barFood-grade silicone

FAQ

Delivery, materials and lead times for your order

Pick a topic or open any question

Our factory is in Tashkent — we deliver to Chilanzar District same day or next morning by courier or carrier. Delivery to Chilanzar in 1 day. Packaging and documents for every batch.

Depends on medium (oil, water, steam, chemicals), temperature and pressure. Send drawing or sample via Telegram — our engineer will select NBR, EPDM, Viton, silicone or polyurethane for your site in Chilanzar District. See the selection table below.

From 100 pcs (or one batch for custom shapes). Lead time from 48 hours after drawing and material approval. For urgent orders to Chilanzar District, ask when ordering — we often accelerate using existing molds.

HomeCatalog
BlogOrderContacts